Landing Point · DK Denmark
| Cable | Status |
|---|---|
| CANTAT-3 | Active |
| DANICE | Active |
| Havfrue/AEC-2 | Active |
| IOEMA | Planned |
| IOEMA-1 | Planned |
RTT measurements to this landing point from 2026-03-03 through 2026-07-15 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.
| Probe | Location | Samples | Avg |
|---|---|---|---|
| #27746 | control probe | 47 | 53.6 ms |
| #1014473 own probe | Minsk BY | 28 | 83.1 ms |
| #64769 | control probe | 26 | 125.5 ms |
| #4429 | control probe | 19 | 177.7 ms |
| #1014597 own probe | Tbilisi GE | 19 | 59.1 ms |
| #1014589 own probe | Almaty KZ | 18 | 103.3 ms |
| #1014969 own probe | Jerusalem IL | 13 | 79.7 ms |
| #6427 own probe | Sydney AU | 8 | 269.9 ms |
| #1015563 own probe | Saint Petersburg RU | 6 | 34.7 ms |
| #7102 | control probe | 5 | 182.7 ms |
| #6410 own probe | Sao Paulo BR | 2 | 205.0 ms |
| #1015523 own probe | Moscow RU | 2 | 48.0 ms |
| #1016031 own probe | Kyiv UA | 2 | 42.1 ms |

Blaabjerg, Denmark is a submarine cable landing point in Denmark (coordinates 55.7517°, 8.3292°). It serves 5 submarine cable systems, making it a significant node in Denmark's international connectivity infrastructure.
Until January 1, 2007, Blaabjerg was a municipality in Ribe County on the west coast of the Jutland peninsula in southwest Denmark. The municipality covered an area of 254 km2, and had a total population of 6,509 (2005). Its latest mayor was Preben Olesen. The site of its municipal council was the town of Nørre Nebel. Wikipedia
| Cable | RFS | Length | Owners |
|---|---|---|---|
| IOEMA | 2028 | 1,620 km | IOEMA Fibre |
| Havfrue/AEC-2 | 2020 | 7,650 km | Bulk Infrastructure, EXA Infrastructure, Google, … |
| DANICE | 2009 | 2,304 km | Farice |
| CANTAT-3 | 1994 | 270 km | Shefa |
| IOEMA-1 | — | — | — |
Cables landing at Blaabjerg, Denmark are operated by 7 distinct consortium partners and carriers, including Bulk Infrastructure, EXA Infrastructure, Farice, Google, IOEMA Fibre, Meta, Shefa. Each cable is typically jointly owned by a consortium of tier-one carriers and hyperscale operators who share construction costs and capacity; the operator mix reflects both regional incumbents and global players with interest in the routes served by this landing point.
From Blaabjerg, Denmark, international traffic can reach 8 countries through 5 cable systems. Destinations include Denmark, Germany, Iceland, Ireland, Netherlands, Norway, United Kingdom, United States. With multiple redundant paths, traffic at this landing point can reroute through alternative cables if any single system experiences an outage.
No monitoring incidents were recorded on cables serving Blaabjerg, Denmark in the past 90 days — all connected systems remained within normal latency thresholds. Our monitoring network continuously samples latency from external probes to targets reachable via these cables.
What next: Blaabjerg, Denmark in the global directory of cable landing points; see surrounding routes on the interactive submarine cable map or follow live network monitoring.
View actual submarine cable routing from Blaabjerg, Denmark - with backbone nodes, distance calculations, and latency estimates