Home
Explore Cables Locations Map ISP status Shutdowns
Live Live Map Health Latency Pulse Big screen 🖥
Learn Research Guide Methodology
HomeLocationsDenmark › Juelsminde, Denmark

Juelsminde, Denmark

Landing Point · DK Denmark

1 Connected Cables 55.7086°N 9.9972°E Denmark
1
Connected Cables
DK
Country
55.71°
Latitude
10.00°
Longitude
Ctrl + Scroll to zoom
👆 Tap to interact with map

Connected Cables

Cable Length RFS Status
GlobalConnect 6 (GC6) -1 km 2019 Active

📡 Live Performance

21
measurements
8
probes
98
days monitored
92.6
ms avg RTT
0
anomalies

RTT measurements to this landing point from 2026-03-17 through 2026-06-23 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#1014473 own probe Minsk BY 5 44.5 ms 37.2-49.3 2026-06-23
#1014589 own probe Almaty KZ 3 95.1 ms 91.6-99.5 2026-03-18
#1014597 own probe Tbilisi GE 3 60.0 ms 60.0-60.0 2026-03-18
#1014969 own probe Jerusalem IL 3 70.0 ms 65.8-77.7 2026-03-18
#6410 own probe Sao Paulo BR 2 185.3 ms 185.3-185.3 2026-06-23
#6427 own probe Sydney AU 2 268.6 ms 268.2-269.1 2026-06-23
#1015523 own probe Moscow RU 2 48.6 ms 47.2-50.0 2026-06-23
#1016031 own probe Kyiv UA 1 42.1 ms 42.1-42.1 2026-06-23

About Juelsminde, Denmark

Juelsminde: A Coastal Connection in Denmark

Juelsminde, a charming coastal town in the Central Denmark Region, may not be a major hub for submarine cables, but its role in Denmark's connectivity landscape is quietly significant. Nestled in Hedensted Municipality, Juelsminde is home to one submarine cable landing point: the GlobalConnect 6 (GC6) cable, which has been operational since 2019. While Denmark boasts 30 submarine cables across 34 landing points, Juelsminde's single cable places it among the smaller players in this network, ranking in the top 74% by cable count.

GlobalConnect 6: Stitching the Coastline Together

The GC6 cable is a domestic connection that links Juelsminde to Bogense, another landing point across the Kattegat Strait. This cable does not extend internationally, but its role in tying together regional networks is essential for Denmark's internal connectivity. Juelsminde's position in this chain highlights its contribution to the seamless flow of data within the country, supporting local businesses, residents, and institutions. Juelsminde's connection to Bogense is part of a broader pattern of Denmark's submarine cable infrastructure, which stitches together coastal towns and cities to ensure robust domestic communication. While larger landing points like Blaabjerg (hosting five cables) and Gedser (hosting four cables) serve as critical nodes for international and domestic traffic, Juelsminde's single cable reflects a more localized focus.

Latency Insights: A Reliable Connection

GeoCables' unique latency measurements reveal that Juelsminde offers dependable connectivity. Across 21 completed checks from eight source cities, the average round-trip latency to Juelsminde is 93 milliseconds, with the best observed latency being an impressive 37 milliseconds. These numbers underscore the efficiency of the GC6 cable in facilitating fast and reliable data transfer, ensuring that Juelsminde remains well-connected despite its modest infrastructure.

The Town Behind the Cable

Juelsminde itself is a picturesque coastal town, located southeast of Horsens and east of Vejle. Its proximity to larger cities makes it an attractive spot for residents seeking a quieter lifestyle while staying connected to urban centers. The town's maritime charm and regional significance are complemented by its role in Denmark's digital network, where the GC6 cable quietly supports the community's connectivity needs.

Conclusion

Though Juelsminde may not rival Denmark's larger landing points in cable count, its connection via the GC6 cable plays an essential part in the country's domestic network. Linking Juelsminde to Bogense, this cable ensures reliable data flow and supports the town's integration into Denmark's broader connectivity framework. For Juelsminde, the GC6 cable is not just a technical asset-it is a thread that ties this coastal town to the rest of Denmark.

Other Landing Points in Denmark

Landing Point

  • CountryDK Denmark
  • Coordinates55.7086°N 9.9972°E
  • Connected Cables1

See Real Cable Routes

View actual submarine cable routing from Juelsminde, Denmark - with backbone nodes, distance calculations, and latency estimates

Open Calculator →
🌊 Submarine cables 🛤 Land fiber 📡 Live probes
Explore GeoCables: interactive submarine cable map · all 700+ submarine cables · live internet latency map · cable landing points worldwide · internet & ISP outages in Denmark

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?