Home
Explore Cables Locations Map ISP status Transit map Country resilience Check my connection
Live Live Map Cable monitoring Events log Cable incidents Big screen
Learn Research Guide Methodology Latency Deployments by year Pulse Open dataset API Widgets What's new About Contact
Incident report · 2026101101

Medusa Submarine Cable System: latency up to 5.1× normal, 11 Oct 2026

Resolved · 2h 55m
XTelegramWhatsAppFacebook

What we measured

CableMedusa Submarine Cable System
SegmentTartous, SY → Carcavelos, PT
Detected2026-10-11 03:08 UTC
Resolved2026-10-11 06:03 UTC
Duration2h 55m
Observed latency81.5 ms
Baseline111.8 ms · 5.08×
Increase+408%
Severitycritical

Who is affected

Countries where Medusa Submarine Cable System comes ashore, how much of their submarine diversity this cable represents, and what our measurements into them show.

CountryDependence on this cableOther submarine cablesWhat the measurements show
Algeria
resilience index: 88 · resilient
1 of 7 cables (14% of submarine diversity) Africa-1, Alpal-2, Med Cable Network +3 more average 49 ms over the last day vs 53 ms over 30 days - unchanged
Cyprus
resilience index: 88 · resilient
1 of 15 cables (7% of submarine diversity) Blue, CADMOS, CADMOS-2 +11 more no measurement today; median 36 ms over 30 days (8 routes)
Egypt
resilience index: 100 · resilient
1 of 25 cables (4% of submarine diversity) 2Africa, Africa-1, Aletar +21 more no measurement today; median 135 ms over 30 days (58 routes)
France
resilience index: 100 · resilient
1 of 35 cables (3% of submarine diversity) 2Africa, Africa Coast to Europe (ACE), Africa-1 +31 more median 61 ms today vs 71 ms over 30 days (636 routes) - unchanged
Greece
resilience index: 100 · resilient
1 of 21 cables (5% of submarine diversity) 2Africa, Adria-1, ANDROMEDA +17 more median 88 ms today vs 70 ms over 30 days (71 routes) - slower
Italy
resilience index: 100 · resilient
1 of 38 cables (3% of submarine diversity) 2Africa, ANDROMEDA, Asia Africa Europe-1 (AAE-1) +34 more median 164 ms today vs 80 ms over 30 days (348 routes) - slower
Libya
resilience index: 84 · resilient
1 of 6 cables (17% of submarine diversity) Europe India Gateway (EIG), Italy-Libya, LFON (Libyan Fiber Optic Network) +2 more median 187 ms today vs 185 ms over 30 days (7 routes) - unchanged
Malta
resilience index: 70 · moderate
1 of 8 cables (13% of submarine diversity) Epic Malta-Sicily Cable System (EMSCS), GO-1 Mediterranean Cable System, Italy-Malta +4 more no measurement today; median 92 ms over 30 days (22 routes)
Morocco
resilience index: 92 · resilient
1 of 8 cables (13% of submarine diversity) Atlas Offshore, Canalink, EllaLink +4 more no measurement today; median 109 ms over 30 days (44 routes)
Portugal
resilience index: 100 · resilient
1 of 21 cables (5% of submarine diversity) 2Africa, Africa Coast to Europe (ACE), Azores Fiber Optic System (AFOS) +17 more median 91 ms today vs 88 ms over 30 days (603 routes) - unchanged
Spain
resilience index: 100 · resilient
1 of 39 cables (3% of submarine diversity) 2Africa, Africa Coast to Europe (ACE), Almería-Melilla (ALME) +35 more no measurement today; median 81 ms over 30 days (294 routes)
Syria
resilience index: 49 · vulnerable
1 of 6 cables (17% of submarine diversity) Aletar, BERYTAR, Ebla +2 more average 58 ms over the last day vs 54 ms over 30 days - unchanged
Tunisia
resilience index: 52 · vulnerable
1 of 6 cables (17% of submarine diversity) Didon, HANNIBAL System, PEACE Cable +2 more no measurement today; median 73 ms over 30 days (8 routes)

Dependence is structural (share of the country's submarine cables), not a traffic share: real traffic distribution across cables is not public.

Path analysis

Traffic kept the same route. Latency rose without a visible path change, which points at congestion or a fault on the existing route rather than a reroute.

Cross-probe verdict. Too few independent vantage points were watching this endpoint to reach a cross-probe verdict.

Timeline

Detection method

Latency is sampled continuously from our probe network. An alert opens when round-trip time to a monitored endpoint holds above its rolling baseline, and closes automatically once it returns. Full method is described on the methodology page.

How to cite

GeoCables (2026). Incident 2026101101: Medusa Submarine Cable System. https://geocables.com/incident/2026101101

Embed this map

<iframe src="https://geocables.com/embed.php?type=map&id=medusa-submarine-cable-system" width="640" height="420" frameborder="0" loading="lazy" style="border:0;border-radius:10px"></iframe>

← All cable events

Log In

Access your routes, favorites, and API key

Create account Forgot password?