4 submarine cable landing points in Cyprus. View coordinates, connected cables, and detailed location info.
Cyprus has four submarine cable landing points located in Girne, Iskele, Pentaskhinos, and Yeroskipos. These landing stations connect the country to a total of 15 submarine cables. The longest cable serving Cyprus is the PEACE Cable, which became ready for service in 2022 and spans 25,000 kilometers, linking Cyprus with Egypt, France, Kenya, the Maldives, Malta, and Pakistan. The newest cable is Blue, which entered service in 2023, extending 5,055 kilometers and connecting Cyprus to France, Greece, Israel, Italy, and Jordan.
Other operational cables include the Medusa Submarine Cable System, expected to be fully in service by 2026, and the MedNautilus Submarine System, which has been active since 2001. Additional connections link Cyprus to neighboring countries such as Turkey, Syria, Lebanon, and Israel. The country’s main internet providers by user base are the Cyprus Telecommunications Authority, Cablenet Communication Systems, EPIC, Primetel, and KIBRIS MOBILE TELEKOMUNIKASYON.
Cyprus is classified as resilient in terms of internet connectivity, meaning that its network can continue to function even if a single cable or station is lost. No outages have been recorded by GeoCables in the past 90 days.
Every cable that lands in this country, with live latency on its page.
Cables landing here whose break would hurt this country most, by our cable graph.
No single cable break would cut this country off: alternatives exist for every cable.
| Name | Connected Cables |
|---|---|
| Girne, Cyprus › | 1 |
| Iskele, Cyprus › | 1 |
| Pentaskhinos, Cyprus › | 8 |
| Yeroskipos, Cyprus › | 6 |
Internet status by provider and the resilience of the country's cable connectivity.
Cyprus has 15 submarine cables and 4 landing points in the GeoCables database. The ones with the most landing points here are POSEIDON, Blue, CADMOS.
The oldest cable in service is Turcyos-1 (1993), the newest is Medusa Submarine Cable System (2026). Planned: Ebla (2028), UGARIT 2 (2028).
By our cable graph no single break cuts Cyprus off. The largest effect comes from Hawk: up to plus 4.7 ms towards Brazil. We count paths and milliseconds, not capacity.
At the last check (2026-11-16 16:15 UTC) the internet in Cyprus was working normally. Providers and history