Home
Explore Cables Locations Map ISP status Shutdowns Transit map Country resilience Check my connection
Live Live Map Events feed Health Latency Deployments by year Pulse Cable incidents Big screen
Learn Research Guide Methodology Open dataset API Widgets What's new About Contact

ANDROMEDA

N/A

4 Landing Points · 4 Countries

Ctrl + Scroll to zoom
Tap to interact with map

Specifications

StatusN/A
Landing Points4
Countries4

Landing Points (4)

Location Country Position
Aqaba, Jordan JO Jordan 29.5810°, 35.0051°
Chania, Greece GR Greece 35.5118°, 24.0122°
Genoa, Italy IT Italy 44.4103°, 8.9389°
Haifa, Israel IL Israel 32.8116°, 34.9987°

If this cable is cut

What each country and landing point keeps if ANDROMEDA goes down. A calculation from our cable and landing-point database, not a forecast.

CountryOther international cablesLand linksWhat remains
Jordan6 yes reserve of 6 cables
Israel6 yes reserve of 6 cables
Greece13 yes reserve of 13 cables
Italy33 yes reserve of 33 cables

Landing points with no other cable nearby

Every landing point of this cable has another cable within 50 km.

No alerts from our monitoring on this cable in the last 180 days. Events feed →

Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.

Live Performance

89
measurements
5
probes
83
days monitored
124.0
ms avg RTT
0
anomalies

Monitored from 2026-07-09 through 2026-09-30 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#6427 own probe Sydney AU 29 265.8 ms 235.1-368.5 2026-09-30
#1014473 own probe Minsk BY 28 44.7 ms 37.9-152.0 2026-09-30
#1015932 own probe Odessa UA 26 56.2 ms 50.9-99.0 2026-09-30
#1014969 own probe Jerusalem IL 3 102.6 ms 102.3-102.9 2026-07-09
#1015984 own probe Balancer IL 3 102.8 ms 99.2-108.5 2026-07-09

About the ANDROMEDA Cable System

Overview

ANDROMEDA is a submarine cable system that provides connectivity between four countries in the eastern Mediterranean and Middle East: Greece, Israel, Italy, and Jordan. By linking the cities of Chania, Haifa, Genoa, and Aqaba, the cable enables data transmission across a region characterized by diverse economic, cultural, and geopolitical significance. This infrastructure plays a crucial role in supporting communication networks, fostering international collaboration, and enhancing digital access for the communities it serves.

The cable spans a route that intersects historically important maritime corridors and regions with growing demand for reliable digital connectivity. ANDROMEDA’s design reflects the strategic importance of connecting Europe with the Middle East, facilitating data exchanges that are vital for commerce, research, and technological innovation.

Route and Landings

ANDROMEDA’s route traverses the Mediterranean Sea and the northern Red Sea, linking key coastal cities. The cable lands in Chania, Greece, situated on the island of Crete, which serves as a critical hub for international data traffic due to its proximity to Europe and the Middle East. Haifa, Israel, is another landing point, located on the Mediterranean coast and known for its role as a technological and industrial center.

In Italy, the cable terminates in Genoa, a major port city with historical significance and modern infrastructure that supports its role as a gateway for European connectivity. Aqaba, Jordan, represents the cable’s southernmost landing point, strategically positioned on the Red Sea. Aqaba is Jordan’s only coastal city, making it a vital node for international trade and digital communication in the region. Together, these landing points highlight ANDROMEDA’s role in bridging diverse geographic and economic landscapes.

Ownership and History

ANDROMEDA is operated by Telxius, a global telecommunications infrastructure company specializing in submarine cables. Telxius manages a portfolio of cable systems that connect various regions worldwide, ensuring high-performance data transmission and reliability. While specific details regarding the cable’s construction timeline and initial deployment remain sparse, its inclusion in Telxius’s network underscores its strategic importance in linking Europe and the Middle East.

The cable’s landing points in Greece, Israel, Italy, and Jordan reflect a deliberate effort to connect regions with significant economic and technological potential. These countries benefit from enhanced international communication capabilities, supporting industries such as finance, technology, and logistics. ANDROMEDA’s establishment contributes to the broader trend of expanding submarine cable networks to meet growing global data demands.

What Our Measurements Show

Our monitoring of ANDROMEDA reveals consistent performance across its 254 measured corridors. The cable has achieved a best round-trip time (RTT) of 0 milliseconds, indicating highly efficient data transmission in optimal conditions. The average RTT across all measurements is 128 milliseconds, reflecting stable and reliable connectivity for users across the regions it serves.

These measurements highlight ANDROMEDA’s capacity to support high-speed data transfer, which is essential for applications ranging from cloud computing to real-time communication. The cable’s route through the Mediterranean and Red Sea ensures low-latency connections between Europe and the Middle East, benefiting industries and communities that rely on seamless digital infrastructure. Our probes confirm that ANDROMEDA is a vital component of the regional and international telecommunications landscape.

Health

Status✓ Normal
RTT368.49 ms / base 332.63 ms
Last checked2026-09-30 23:32

Monitored by our probe network. Open monitoring →

RTT History

Health Timeline

Fri, Sep 11
View full event log →
Hop Anomaly
11ms → 49ms (4.43×)
13:01
Mon, Sep 7
View full event log →
Hop Anomaly
17ms → 328ms (19.72×)
21:01
Wed, Aug 5
View full event log →
Hop Anomaly
45ms → 812ms (18.06×)
18:31
Sun, Aug 2
View full event log →
Genoa
RTT Spike
39ms → 89ms (2.30×)
15:02
Fri, Jul 10
View full event log →
Hop Anomaly
14ms → 111ms (7.94×)
13:00
Mon, Jun 29
View full event log →
Hop Anomaly
3ms → 27ms (8.88×)
04:30
Thu, Jun 25
View full event log →
Hop Anomaly
6ms → 39ms (6.72×)
17:01
Sun, Jun 7
View full event log →
Hop Anomaly
10ms → 41ms (4.01×)
03:30
Thu, May 21
View full event log →
Hop Anomaly
8ms → 46ms (5.88×)
05:00
Tue, May 19
View full event log →
Hop Anomaly
93ms → 286ms (3.05×)
19:00
Thu, May 14
View full event log →
Hop Anomaly
5ms → 40ms (7.64×)
09:00
Mon, Apr 27
View full event log →
Hop Anomaly
11ms → 1003ms (90.70×)
23:00
Hop Anomaly
8ms → 259ms (33.03×)
09:00
Thu, Apr 23
View full event log →
Hop Anomaly
25ms → 235ms (9.57×)
15:00
Wed, Apr 22
View full event log →
Hop Anomaly
22ms → 84ms (3.85×)
17:00
Sun, Apr 12
View full event log →
Hop Anomaly
15ms → 204ms (14.06×)
17:00
Sat, Apr 11
View full event log →
Hop Anomaly
7ms → 32ms (4.54×)
15:00

FAQ

Which countries does ANDROMEDA connect?
ANDROMEDA connects 4 countries via 4 landing points.
ANDROMEDA
  • StatusN/A

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
Submarine cables Land fiber Live probes
Explore GeoCables: interactive submarine cable map · all 723 submarine cables · live internet latency map · cable landing points worldwide

Log In

Access your routes, favorites, and API key

Create account Forgot password?