Accueil
Explorer Câbles Emplacements Carte État des FAI Coupures
Live Carte live Santé Latence Pouls Grand écran 🖥
Apprendre Recherches Guide Méthodologie
AccueilCâbles sous-marins › EMC West-1

EMC West-1

Planifié

3,639 km · 5 Points d'atterrissage · 4 Pays · Mise en service: 2027

Ctrl + Scroll to zoom
👆 Tap to interact with map

Spécifications

Longueur3,639 km
StatutPlanifié
Mise en service2027
Points d'atterrissage5
Pays4

Propriétaires

EMC Subsea Cable Company Limited

Points d'atterrissage (5)

Emplacement Pays Position
Athens, Greece GR Greece 37.9761°, 23.7363°
Genoa, Italy IT Italy 44.4103°, 8.9389°
Haql, Saudi Arabia SA Saudi Arabia 29.2839°, 34.9522°
Netanya, Israel IL Israel 32.3439°, 34.8720°
Tympaki, Greece GR Greece 35.0714°, 24.7683°

📡 Performance en direct

213
mesures
4
sondes
124
jours surveillés
120.2
ms RTT moy.
0
anomalies

Mesuré du 2026-03-06 au 2026-07-09 - RTT ICMP via les sondes RIPE Atlas. Recalculé quotidiennement à partir des données brutes. ✓ Aucune anomalie détectée sur la période.

Sources de mesure

Sonde Emplacement Mesures Moy. Min-Max Dernière
#6427 sonde propre Sydney AU 55 246.0 ms 245.4-257.6 2026-07-09
#1014473 sonde propre Minsk BY 55 55.0 ms 48.5-114.4 2026-07-09
#1015932 sonde propre Odessa UA 55 69.4 ms 67.2-108.3 2026-07-09
#99 RIPE Atlas 48 109.2 ms 70.3-168.6 2026-04-08

À propos du EMC West-1 câble

Overview

EMC West-1 is a regional submarine cable spanning approximately 3,639 kilometres across the eastern Mediterranean and Red Sea corridor. It connects Greece, Israel, Italy, and Saudi Arabia, serving as a direct link between southern Europe, the Levant, and the Arabian Peninsula.

Route and Landings

In Greece, the cable lands at two points: Athens and Tympaki, located on the southern coast of Crete. In Israel, it has a landing at Netanya, situated on the Mediterranean coastline. Italy is served by a single landing point in Genoa, on the northwestern Ligurian coast. The cable also makes landfall in Haql, a coastal town on the Gulf of Aqaba in Saudi Arabia.

Ownership and Operators

EMC West-1 is owned by EMC Subsea Cable Company Limited, which holds the system as a single owner rather than through a multi-party consortium arrangement.

Status and Timeline

EMC West-1 is planned for a Ready for Service date in 2027. The system is currently under development and not yet operational.

Strategic Context

The eastern Mediterranean and Red Sea corridor is served by several established long-haul cable systems, including the 2Africa, Asia Africa Europe-1 (AAE-1), and IMEWE cables. These larger intercontinental systems extend well beyond the regional scope of EMC West-1's 3,639-kilometre span, traversing tens of thousands of kilometres across multiple continents. In contrast, EMC West-1 operates within a more concentrated geographic footprint linking four countries in close proximity. EMC Subsea Cable Company Limited is the sole owner and operator of EMC West-1, ensuring streamlined management and potentially reduced operational complexities compared to multi-party consortiums. The cable's route strategically connects two Greek landing points — including Crete, which sits at a geographic midpoint in the eastern Mediterranean — with Genoa in northern Italy, Netanya in Israel, and Haql in Saudi Arabia. This direct submarine connectivity bridges southern Europe with the Levant and the northwestern edge of the Arabian Peninsula. The dual Greek landings offer geographic diversity within the country, providing redundancy and resilience to network traffic flows. The Haql landing via the Gulf of Aqaba extends the system's reach into the Red Sea region without requiring a transit through the main Mediterranean basin, potentially reducing latency and improving overall performance for data transmission between these key markets.

📡 Santé

Statut✓ Normal
RTT48.75 ms / base 51.56 ms
Vérifié le2026-07-09 11:02

Surveillance via les sondes RIPE Atlas. Ouvrir le monitoring →

📊 Historique RTT

Route: #1014473 → Genoa Mesuré: 2026-07-09 11:02
48.8 ms
Min Moy Max #
7 jours 48.8 48.8 48.8 1
30 jours 48.5 50.9 65.4 9
60 jours 48.5 55.0 114.4 55

Chronologie

Fri, Jul 10
View full event log →
🔗
Hop Anomaly
16ms → 54ms (3.30×)
07:00
Wed, Apr 8
View full event log →
🔗
Hop Anomaly
3ms → 62ms (20.65×)
04:30

FAQ

Quelle est la longueur du câble EMC West-1 ?
Le câble EMC West-1 mesure 3,639 km.
Quels pays le câble EMC West-1 relie-t-il ?
EMC West-1 connects 4 countries via 5 landing points.
Qui possède le câble EMC West-1 ?
Le câble EMC West-1 appartient à un consortium comprenant EMC Subsea Cable Company Limited.
Quand le câble EMC West-1 a-t-il été mis en service ?
Le câble EMC West-1 a été mis en service en 2027.
EMC West-1
  • Longueur3,639 km
  • StatutPlanifié
  • Mise en service2027

Calculer la distance

Trouvez la distance réelle par câble entre deux villes

Ouvrir le calculateur →
🌊 Submarine cables 🛤 Land fiber 📡 RIPE Atlas
Explore GeoCables: interactive submarine cable map · all 700+ submarine cables · live internet latency map · cable landing points worldwide

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?