Accueil Câbles Emplacements Santé Recherches Guide
AccueilCâbles sous-marins › Ulleung-Mainland 2

Ulleung-Mainland 2

En service

164 km · 2 Points d'atterrissage · 1 Pays · Mise en service: 2016

Ctrl + Scroll to zoom

Spécifications

Longueur164 km
StatutEn service
Mise en service2016
Points d'atterrissage2
Pays1

Propriétaires

KT

Points d'atterrissage (2)

Emplacement Pays Position
Hosan-ri, South Korea KR South Korea 37.1751°, 129.3387°
Ulleung, South Korea KR South Korea 37.4893°, 130.8933°

À propos du Ulleung-Mainland 2 câble

Ulleung-Mainland 2 is a submarine cable system operating within South Korea, with landing points at Hosan-ri, Ulleung. It provides dedicated submarine fiber capacity between these locations, supporting telecommunications, internet access, and enterprise connectivity. Submarine cables in this region contribute to a mesh of redundant paths that keep internet traffic flowing even when individual systems are damaged or under maintenance. GeoCables tracks this cable using RIPE Atlas measurements from four probes in Minsk, Almaty, Tbilisi, and Jerusalem, comparing live RTT against historical baselines to catch performance shifts early.
Ulleung-Mainland 2
  • Longueur164 km
  • StatutEn service
  • Mise en service2016

Calculer la distance

Trouvez la distance réelle par câble entre deux villes

Ouvrir le calculateur →
🌊 Submarine cables 🛤 Land fiber 📡 RIPE Atlas

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?