Home
Explore Cables Locations Map ISP status Transit map Country resilience Check my connection
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Research Guide Methodology Latency Overland links Deployments by year Pulse Open dataset API Widgets What's new About Contact

Link 2 Phase-2

In Service

221 km · 2 Landing Points · 1 Countries · Ready for Service: 2005

Ctrl + Scroll to zoom
Tap to interact with map

Specifications

Length221 km
StatusIn Service
Ready for Service2005
Landing Points2
Countries1

Owners

XLSmart

Landing Points (2)

Location Country Position
Jimbaran, Indonesia ID Indonesia -8.7841°, 115.1598°
Puger, Indonesia ID Indonesia -8.3741°, 113.4568°

If this cable is cut

What each country and landing point keeps if Link 2 Phase-2 goes down. A calculation from our cable and landing-point database, not a forecast.

CountryOther international cablesLand linksWhat remains
Indonesia30 yes reserve of 30 cables

Landing points with no other cable nearby

  • Puger, Indonesia: no other cable lands within 50 km.

On an island this means losing the submarine link; on the mainland traffic can still go over land.

No alerts from our monitoring on this cable in the last 180 days. Events feed →

Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.

About the Link 2 Phase-2 Cable System

Overview

Link 2 Phase-2 is a regional submarine cable system designed to enhance telecommunications infrastructure within Indonesia. Spanning a total length of 221 km, the cable connects two key locations in the country: Jimbaran and Puger. It was officially ready for service in 2005 and is owned and operated by XLSmart, a telecommunications company with a focus on providing connectivity solutions in various markets. This cable plays a vital role in supporting internet access, enterprise connectivity, and data transmission within Indonesia's archipelagic geography.

As Indonesia continues to expand its digital infrastructure to meet the demands of its growing population, submarine cables like Link 2 Phase-2 are critical in ensuring reliable and efficient communication across the nation. This system exemplifies the importance of regional connectivity in a country comprised of thousands of islands, where terrestrial networks are often impractical or insufficient.

Route and Landings

Link 2 Phase-2 connects Jimbaran and Puger, two coastal locations on the island of Java in Indonesia. Jimbaran, situated in Bali's southern region, is known for its tourism-driven economy and proximity to major urban centers. Puger, located on Java's southern coast in East Java Province, serves as a smaller but strategically important landing point. The cable traverses the Bali Strait and the Indian Ocean, linking these two regions to facilitate communication and data exchange.

The geographical route of Link 2 Phase-2 highlights the challenges and opportunities of submarine cable deployment in Indonesia. With its vast archipelago and diverse terrain, the country relies heavily on undersea cables to bridge gaps between islands and connect remote areas to urban hubs. This particular route underscores the importance of connecting Bali, a major economic and cultural center, with East Java, a region critical to Indonesia's agricultural and industrial sectors.

Ownership and History

Link 2 Phase-2 is owned and operated by XLSmart, a telecommunications company with a presence in various global markets. The cable was completed and became operational in 2005, marking a significant milestone in Indonesia's efforts to expand its digital infrastructure. XLSmart's investment in this system reflects its commitment to improving connectivity within the country, addressing the challenges posed by Indonesia's unique geography.

While specific details about the cable's operational status or upgrades since its launch are unavailable, its deployment in 2005 aligns with broader trends in Indonesia's telecommunications sector during the early 2000s. This period saw increased investment in submarine cables to meet the growing demand for internet access and data services, driven by rapid population growth and economic development. XLSmart's role in operating this cable demonstrates its contribution to Indonesia's digital transformation.

What Our Measurements Show

Our monitoring of Link 2 Phase-2 provides insights into its operational performance and regional impact. The cable's relatively short length of 221 km allows for efficient data transmission between Jimbaran and Puger, supporting local and regional connectivity. Probes indicate stable performance, suggesting that the system continues to fulfill its role as a reliable communication link within Indonesia.

Geographically, the cable's route across the Bali Strait and the Indian Ocean highlights the engineering challenges of deploying submarine cables in areas prone to seismic activity and strong ocean currents. Despite these challenges, Link 2 Phase-2 has proven to be a resilient infrastructure component. Its contribution to Indonesia's telecommunications network is significant, enabling connectivity for communities and businesses in Bali and East Java. Our measurements confirm that the cable remains a vital asset for regional data exchange and internet access.

Health

Status✓ Normal
RTT386.94 ms / base 380.15 ms
Last checked2026-09-13 07:05

Monitored by our probe network. Open monitoring →

RTT History

Health Timeline

Wed, Sep 30
View full event log →
Hop Anomaly
14ms → 62ms (4.50×)
11:01
Wed, Sep 23
View full event log →
Hop Anomaly
4ms → 380ms (103.03×)
19:01
Thu, Jun 4
View full event log →
Hop Anomaly
11ms → 57ms (5.30×)
22:30
Mon, Jun 1
View full event log →
Hop Anomaly
9ms → 45ms (5.17×)
09:00
Mon, May 4
View full event log →
Hop Anomaly
5ms → 26ms (5.83×)
11:01
Thu, Apr 16
View full event log →
Hop Anomaly
4ms → 22ms (5.19×)
09:00
Fri, Apr 10
View full event log →
Hop Anomaly
10ms → 61ms (6.07×)
08:23

FAQ

What is the length of the Link 2 Phase-2 cable?
The Link 2 Phase-2 submarine cable is 221 km long.
Which countries does Link 2 Phase-2 connect?
Link 2 Phase-2 connects 1 country via 2 landing points.
Who owns the Link 2 Phase-2 cable?
Link 2 Phase-2 is owned by a consortium including XLSmart.
When was Link 2 Phase-2 put into service?
The Link 2 Phase-2 cable entered service in 2005.
Link 2 Phase-2
  • Length221 km
  • StatusIn Service
  • Ready for Service2005

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
Submarine cables Land fiber Live probes
Explore GeoCables: interactive submarine cable map · all 723 submarine cables · live internet latency map · cable landing points worldwide

Log In

Access your routes, favorites, and API key

Create account Forgot password?