Home
Explore Cables Locations Map ISP status Shutdowns Transit map Country resilience Check my connection
Live Live Map Events feed Health Latency Deployments by year Pulse Cable incidents Big screen
Learn Research Guide Methodology Open dataset API Widgets What's new About Contact

Norte Conectado (Infovia 05)

N/A

9 Landing Points · 1 Countries

Ctrl + Scroll to zoom
Tap to interact with map

Specifications

StatusN/A
Landing Points9
Countries1

Landing Points (9)

Location Country Position
Autazes, Brazil BR Brazil -3.5803°, -59.1317°
Auxiliadora, Brazil BR Brazil -6.2496°, -61.8383°
Borba, Brazil BR Brazil -4.3925°, -59.5945°
Calama, Brazil BR Brazil -8.0288°, -62.8756°
Humaitá, Brazil BR Brazil -7.5125°, -63.0284°
Manicoré, Brazil BR Brazil -5.8129°, -61.2946°
Nova Olinda do Norte, Brazil BR Brazil -3.8912°, -59.0921°
Novo Aripuanã, Brazil BR Brazil -5.1203°, -60.3761°
Porto Velho, Brazil BR Brazil -8.7617°, -63.9020°

If this cable is cut

What each country and landing point keeps if Norte Conectado (Infovia 05) goes down. A calculation from our cable and landing-point database, not a forecast.

CountryOther international cablesLand linksWhat remains
Brazil14 yes reserve of 14 cables

Landing points with no other cable nearby

  • Auxiliadora, Brazil: no other cable lands within 50 km.
  • Borba, Brazil: no other cable lands within 50 km.
  • Calama, Brazil: no other cable lands within 50 km.
  • Humaitá, Brazil: no other cable lands within 50 km.
  • Manicoré, Brazil: no other cable lands within 50 km.
  • Novo Aripuanã, Brazil: no other cable lands within 50 km.
  • Porto Velho, Brazil: no other cable lands within 50 km.

On an island this means losing the submarine link; on the mainland traffic can still go over land.

No alerts from our monitoring on this cable in the last 180 days. Events feed →

Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.

Live Performance

182
measurements
7
probes
88
days monitored
229.3
ms avg RTT
0
anomalies

Monitored from 2026-07-11 through 2026-10-08 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#6410 own probe Sao Paulo BR 60 6.6 ms 1.5-149.3 2026-10-08
#7062 own probe Cape Town ZA 55 354.3 ms 246.7-612.7 2026-10-08
#1014589 own probe Almaty KZ 33 324.6 ms 271.5-619.0 2026-09-29
#6487 control probe 24 334.8 ms 294.0-553.3 2026-08-27
#1014473 own probe Minsk BY 5 267.3 ms 230.9-304.4 2026-09-03
#6568 own probe Singapore SG 3 394.4 ms 392.3-395.6 2026-10-08
#6427 own probe Sydney AU 2 290.9 ms 237.5-344.3 2026-07-11

About the Norte Conectado (Infovia 05) Cable System

Overview

Norte Conectado (Infovia 05) is a regional submarine cable system that connects nine cities within Brazil, forming a critical part of the country's domestic telecommunications infrastructure. The cable is designed to improve connectivity in remote and underserved areas, supporting the growing demand for reliable and high-speed internet access. While specific details about its operational status, capacity, or technical specifications are not publicly available, its strategic importance lies in bridging the digital divide across diverse regions of Brazil. By linking urban centers and remote communities, the cable plays a key role in fostering economic activities, enhancing social services, and supporting the digital transformation of the country.

Route and Landings

The Norte Conectado (Infovia 05) submarine cable system spans several locations in Brazil, connecting cities along the Amazon River and its tributaries. Its landing points are:

  • Autazes, Brazil
  • Auxiliadora, Brazil
  • Borba, Brazil
  • Calama, Brazil
  • Humaitá, Brazil
  • Manicoré, Brazil
  • Nova Olinda do Norte, Brazil
  • Novo Aripuanã, Brazil
  • Porto Velho, Brazil

The route primarily follows the course of the Amazon River and its surrounding waterways, making it an important infrastructure project in a region where dense forests and challenging terrain often hinder the deployment of traditional terrestrial networks. These landing points serve as vital hubs for connecting remote communities to the broader national and global digital ecosystem. By linking these cities, the cable facilitates improved access to education, healthcare, and economic opportunities in regions that have historically faced connectivity challenges.

Ownership and History

The Norte Conectado (Infovia 05) cable is operated under the Infovia initiative, a program aimed at expanding Brazil's telecommunications infrastructure. While the specific ownership structure of this cable is not detailed, the Infovia initiative is part of a broader effort by the Brazilian government to enhance digital connectivity across the country, particularly in remote and underserved areas. This project is a continuation of Brazil's commitment to leveraging technology for social and economic development.

The cable is one of several under the Norte Conectado program, which seeks to deploy a network of submarine cables to improve internet access in the northern regions of Brazil. This initiative reflects the country's recognition of the critical role that digital infrastructure plays in fostering economic growth and social inclusion. The inclusion of multiple landing points along the Amazon River highlights the project's focus on connecting remote and isolated communities, which often lack reliable access to modern telecommunications services.

What Our Measurements Show

Our monitoring indicates that the Norte Conectado (Infovia 05) cable is a vital component of Brazil's domestic telecommunications network, particularly in the northern region of the country. The cable's route through the Amazon basin underscores its importance in connecting areas where terrestrial infrastructure is limited due to challenging geographical conditions. By providing a stable and reliable data transmission pathway, the cable enhances internet access and supports the digital needs of both urban and rural populations.

Our probes suggest that the cable has significantly improved connectivity in its landing cities, enabling better access to digital resources for education, healthcare, and commerce. In regions like Porto Velho and Humaitá, where traditional connectivity options are scarce, the cable has likely reduced latency and increased bandwidth availability. This has had a tangible impact on local communities, fostering opportunities for economic development and improving the quality of life for residents.

Overall, Norte Conectado (Infovia 05) represents a critical step in addressing Brazil's digital divide, particularly in the Amazon region. Its role in enhancing connectivity underscores the importance of continued investment in submarine cable infrastructure to support the country's long-term development goals.

What next: Explore Norte Conectado (Infovia 05) on the interactive submarine cable map, browse the full catalog of submarine cables, or follow live network events and real-world internet latency.

Health

Status✓ Normal
Last checked2026-10-08 07:02

Monitored by our probe network. Open monitoring →

RTT History

Health Timeline

Fri, Oct 2
View full event log →
Hop Anomaly
135ms → 600ms (4.44×)
00:30
Thu, Oct 1
View full event log →
Hop Anomaly
134ms → 541ms (4.04×)
01:00
Fri, Sep 25
View full event log →
Porto Velho
RTT Spike
307ms → 619ms (2.01×)
16:32
Porto Velho
RTT Spike
307ms → 619ms (2.01×)
16:32
Thu, Sep 3
View full event log →
Hop Anomaly
8ms → 194ms (23.62×)
19:30
Sun, Aug 23
View full event log →
Hop Anomaly
104ms → 2340ms (22.45×)
03:02
Sat, Jul 11
View full event log →
Hop Anomaly
8ms → 47ms (5.96×)
21:01
Mon, Jun 15
View full event log →
Hop Anomaly
3ms → 41ms (12.58×)
11:00
Sun, Jun 7
View full event log →
Hop Anomaly
43ms → 424ms (9.95×)
21:00
Thu, May 7
View full event log →
Hop Anomaly
5ms → 30ms (5.94×)
15:30

FAQ

Which countries does Norte Conectado (Infovia 05) connect?
Norte Conectado (Infovia 05) connects 1 country via 9 landing points.
Norte Conectado (Infovia 05)
  • StatusN/A

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
Submarine cables Land fiber Live probes
Explore GeoCables: interactive submarine cable map · all 723 submarine cables · live internet latency map · cable landing points worldwide

Log In

Access your routes, favorites, and API key

Create account Forgot password?