Home Cables Locations Health Research Guide
HomeLocationsSpain › Las Caletillas, Spain

Las Caletillas, Spain

Landing Point · ES Spain

2 Connected Cables 28.3773°N 16.3624°W Spain
2
Connected Cables
ES
Country
28.38°
Latitude
16.36°
Longitude
Ctrl + Scroll to zoom

Connected Cables

Cable Length RFS Status
Subcan Link 1 143 km 2002 Active
Subcan Link 2 136 km 2002 Active

About Las Caletillas, Spain

Las Caletillas, Spain is a submarine cable landing point in Spain (coordinates 28.3773°, -16.3624°). It serves 2 submarine cable systems, making it a multi-cable landing site in Spain's international connectivity infrastructure.

Connected submarine cables

CableRFSLengthOwners
Subcan Link 12002143 kmCable Submarine de Canarias
Subcan Link 22002136 kmCable Submarine de Canarias

Operators landing at Las Caletillas, Spain

Cables landing at Las Caletillas, Spain are operated by 1 distinct consortium partners and carriers, including Cable Submarine de Canarias. Each cable is typically jointly owned by a consortium of tier-one carriers and hyperscale operators who share construction costs and capacity; the operator mix reflects both regional incumbents and global players with interest in the routes served by this landing point.

Connectivity profile

From Las Caletillas, Spain, international traffic can reach 1 countries through 2 cable systems. Destinations include Spain.

Monitoring status

No monitoring incidents were recorded on cables serving Las Caletillas, Spain in the past 90 days — all connected systems remained within normal latency thresholds. Our monitoring network continuously samples latency from external probes to targets reachable via these cables.

About the cables

  • Subcan Link 1 (2002) — Subcan Link 1 is a submarine cable system operating within Spain, with landing points at Las Caletillas, Piedra Santa. It provides dedicated submarine fiber capacity between these locations, supporting telecommunications, internet access, and enterprise connectivity. Read more →
  • Subcan Link 2 (2002) — Subcan Link 2 is a submarine cable system operating within Spain, with landing points at Las Caletillas, Piedra Santa. It provides dedicated submarine fiber capacity between these locations, supporting telecommunications, internet access, and enterprise connectivity. Read more →

Submarine cable data from TeleGeography. Monitoring metrics updated continuously by GeoCables.

Other Landing Points in Spain

Landing Point

  • CountryES Spain
  • Coordinates28.3773°N 16.3624°W
  • Connected Cables2

See Real Cable Routes

View actual submarine cable routing from Las Caletillas, Spain — with backbone nodes, distance calculations, and latency estimates

Open Calculator →
🌊 Submarine cables 🛤 Land fiber 📡 RIPE Atlas

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?