Landing Point · ES Spain
| Cable | Status |
|---|---|
| Subcan Link 1 | Active |
| Subcan Link 2 | Active |
| Teide | Planned |
RTT measurements to this landing point from 2026-04-21 through 2026-10-01 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.
| Probe | Location | Samples | Avg |
|---|---|---|---|
| own probe | Minsk BY | 5 | 54.0 ms |
| #6427 own probe | Sydney AU | 4 | 279.0 ms |
| #6487 | control probe | 3 | 181.0 ms |
| own probe | Almaty KZ | 3 | 112.4 ms |
| own probe | Jerusalem IL | 3 | 98.2 ms |
| own probe | Odessa UA | 3 | 72.0 ms |
| own probe | Kyiv UA | 3 | 54.6 ms |
| #11124 | control probe | 2 | 28.6 ms |
| #60135 | control probe | 2 | 38.4 ms |
| own probe | Tbilisi GE | 2 | 77.9 ms |
| own probe | Sevastopol UA | 2 | 93.6 ms |
| #1010265 | control probe | 1 | 29.7 ms |
| own probe | Moscow RU | 1 | 62.8 ms |
| #1017909 | control probe | 1 | 35.0 ms |
Las Caletillas, Spain is a submarine cable landing point in Spain (coordinates 28.3773°, -16.3624°). It serves 3 submarine cable systems, making it a multi-cable landing site in Spain's international connectivity infrastructure.
| Cable | RFS | Length | Owners |
|---|---|---|---|
| Subcan Link 1 | 2002 | 143 km | Cable Submarine de Canarias |
| Subcan Link 2 | 2002 | 136 km | Cable Submarine de Canarias |
| Teide | - | - | - |
Cables landing at Las Caletillas, Spain are operated by 1 distinct consortium partners and carriers, including Cable Submarine de Canarias. Each cable is typically jointly owned by a consortium of tier-one carriers and hyperscale operators who share construction costs and capacity; the operator mix reflects both regional incumbents and global players with interest in the routes served by this landing point.
From Las Caletillas, Spain, international traffic can reach 1 countries through 3 cable systems. Destinations include Spain.
No monitoring incidents were recorded on cables serving Las Caletillas, Spain in the past 90 days - all connected systems remained within normal latency thresholds. Our monitoring network continuously samples latency from external probes to targets reachable via these cables.
What next: Las Caletillas, Spain in the global directory of cable landing points; see surrounding routes on the interactive submarine cable map or follow live network monitoring.
View actual submarine cable routing from Las Caletillas, Spain - with backbone nodes, distance calculations, and latency estimates
Open Calculator →