Landing Point · DO Dominican Republic
| Cable | Status |
|---|---|
| East-West Cable (EWC) | Active |
RTT measurements to this landing point from 2026-03-21 through 2026-07-15 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.
| Probe | Location | Samples | Avg |
|---|---|---|---|
| #1014473 own probe | Minsk BY | 8 | 142.4 ms |
| #6410 own probe | Sao Paulo BR | 5 | 141.4 ms |
| #6427 own probe | Sydney AU | 5 | 256.5 ms |
| #6487 own probe | Singapore SG | 5 | 259.4 ms |
| #1015563 own probe | Saint Petersburg RU | 4 | 140.5 ms |
| #1014589 own probe | Almaty KZ | 3 | 219.6 ms |
| #1014597 own probe | Tbilisi GE | 3 | 162.4 ms |
| #1014969 own probe | Jerusalem IL | 3 | 163.7 ms |
| #1015313 own probe | Sevastopol UA | 2 | 196.1 ms |
| #51981 | control probe | 1 | 4.3 ms |
| #62536 | control probe | 1 | 44.9 ms |
| #1014354 | control probe | 1 | 1.2 ms |
| #1015523 own probe | Moscow RU | 1 | 189.6 ms |
| #1016031 own probe | Kyiv UA | 1 | 28.9 ms |

Haina is a landing point on the coast of the Dominican Republic, a Caribbean nation sharing the island of Hispaniola. As a submarine cable landing point, Haina connects the Dominican Republic to other territories across the Caribbean basin. One submarine cable lands at Haina, linking the country to Jamaica and the British Virgin Islands along a regional Caribbean corridor.
The single cable serving Haina, the East-West Cable (EWC), reflects the inter-island character of this landing point. Rather than providing intercontinental connectivity, the EWC establishes direct regional links among Caribbean island territories, positioning Haina as a node within the intra-Caribbean submarine cable network.
The East-West Cable (EWC) is the sole submarine cable landing at Haina. Spanning 1,705 km, this cable reached ready-for-service (RFS) status in 2011 and carries a draft status in the record. In addition to Haina in the Dominican Republic, the EWC connects to landing points in Jamaica and the British Virgin Islands, forming a triangular inter-island link across the northern and central Caribbean Sea.
Within the Dominican Republic, submarine cable infrastructure is distributed across five landing points. Puerto Plata and Punta Cana each host three cables, making them the most connected landing points in the country, while Haina, Cacique, and Santo Domingo each host one cable. Haina ranks in the top 60% of Dominican Republic landing points by cable count, placing it alongside Cacique and Santo Domingo as single-cable termini rather than multi-cable hubs.
Haina functions as a single-cable terminus, serving the regional Caribbean corridor established by the East-West Cable. The EWC's connections to Jamaica and the British Virgin Islands extend the Dominican Republic's submarine cable reach westward and eastward across the Caribbean, providing a direct inter-island route that complements the broader Dominican cable network concentrated at Puerto Plata and Punta Cana. The Dominican Republic's submarine cable infrastructure as a whole spans six cables with an average length of 9,113 km, reflecting a mix of regional and longer-haul routes; the EWC at Haina represents the country's short-range, intra-Caribbean dimension of that network.
As one of five landing points in the Dominican Republic, Haina's role is defined by its Caribbean regional reach rather than intercontinental scope. In the regional submarine cable graph, this single-cable landing point adds a westward and eastern inter-island connection that broadens the geographic spread of Dominican Republic cable landings beyond the country's more heavily served northern and eastern coastal sites.
What next: Haina, Dominican Republic in the global directory of cable landing points; see surrounding routes on the interactive submarine cable map or follow live network monitoring.
View actual submarine cable routing from Haina, Dominican Republic - with backbone nodes, distance calculations, and latency estimates
Open Calculator →