Landing Point · PA Panama
| Cable | Status |
|---|---|
| South American Crossing (SAC) | Active |
RTT measurements to this landing point from 2026-03-04 through 2026-05-15 — live ICMP round-trip time via RIPE Atlas probes. Recomputed daily. ✓ No anomalies detected in the monitored period.
| Probe | Location | Samples | Avg |
|---|---|---|---|
| #61587 | RIPE Atlas | 50 | 179.2 ms |
| #1014473 own probe | Minsk BY | 5 | 200.4 ms |
| #1014589 own probe | Almaty KZ | 5 | 289.4 ms |
| #1014597 own probe | Tbilisi GE | 5 | 221.5 ms |
| #4113 | RIPE Atlas | 4 | 182.2 ms |
| #1014969 own probe | Jerusalem IL | 2 | 225.5 ms |
| #1015313 own probe | Sevastopol UA | 2 | 240.2 ms |
| #1015523 own probe | Moscow RU | 1 | 191.5 ms |
Colón, Panama is a submarine cable landing point in Panama (coordinates 9.3537°, -79.9000°). It serves 1 submarine cable system, making it a single-cable landing in Panama's international connectivity infrastructure.
| Cable | RFS | Length | Owners |
|---|---|---|---|
| South American Crossing (SAC) | 2000 | 20,000 km | Cirion Technologies, Sparkle |
From Colón, Panama, international traffic can reach 8 countries through 1 cable system. Destinations include Argentina, Brazil, Chile, Colombia, Panama, Peru, Venezuela, Virgin Islands (U.S.). This location depends on a single cable system — a characteristic that makes it strategically sensitive to physical disruptions.
No monitoring incidents were recorded on cables serving Colón, Panama in the past 90 days — all connected systems remained within normal latency thresholds. Our monitoring network continuously samples latency from external probes to targets reachable via these cables.
View actual submarine cable routing from Colón, Panama — with backbone nodes, distance calculations, and latency estimates
Open Calculator →