Home
Explore Cables Locations Map ISP status Transit map Country resilience Check my connection
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Research Guide Methodology Latency Overland links Deployments by year Pulse Open dataset API Widgets What's new About Contact

Link 4 Phase-2

In Service

300 km · 2 Landing Points · 1 Countries · Ready for Service: 2005

Ctrl + Scroll to zoom
Tap to interact with map

Specifications

Length300 km
StatusIn Service
Ready for Service2005
Landing Points2
Countries1

Owners

XLSmart

Landing Points (2)

Location Country Position
Mentigi, Indonesia ID Indonesia -3.1960°, 107.6964°
Sungailiat, Indonesia ID Indonesia -1.8515°, 106.1325°

If this cable is cut

What each country and landing point keeps if Link 4 Phase-2 goes down. A calculation from our cable and landing-point database, not a forecast.

CountryOther international cablesLand linksWhat remains
Indonesia30 yes reserve of 30 cables

Landing points with no other cable nearby

Every landing point of this cable has another cable within 50 km.

No alerts from our monitoring on this cable in the last 180 days. Events feed →

Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.

Live Performance

317
measurements
8
probes
94
days monitored
253.2
ms avg RTT
0
anomalies

Monitored from 2026-07-11 through 2026-10-14 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#6427 own probe Sydney AU 107 200.7 ms 1.0-529.3 2026-10-14
#6410 own probe Sao Paulo BR 103 371.9 ms 0.4-904.6 2026-10-14
own probe Almaty KZ 61 274.4 ms 57.7-368.8 2026-10-05
#6487 control probe 24 18.6 ms 17.9-20.6 2026-08-25
#6568 own probe Singapore SG 10 52.4 ms 51.0-54.5 2026-10-14
own probe Jerusalem IL 10 224.9 ms 220.7-233.5 2026-09-07
#7062 control probe 1 204.8 ms 204.8-204.8 2026-07-11
own probe Tbilisi GE 1 323.1 ms 323.1-323.1 2026-07-11

About the Link 4 Phase-2 Cable System

Overview

Link 4 Phase-2 is a submarine cable system designed to enhance regional connectivity within Indonesia. Spanning 300 kilometers, the cable links two key locations: Mentigi and Sungailiat, both situated on the islands of Indonesia. Operational since 2005, the system is owned and managed by XLSmart, a telecommunications company serving various regions of the country. Link 4 Phase-2 plays a critical role in supporting local telecommunications and internet services, contributing to the broader infrastructure that connects Indonesia's dispersed islands.

As part of Indonesia's domestic network, the cable helps address the challenges posed by the nation's geography. With over 17,000 islands, Indonesia depends on submarine cables to bridge gaps between its communities, ensuring reliable communication and data transfer. Link 4 Phase-2 is a vital component of this effort, providing a stable connection between two significant locations on Indonesia's map.

Route and Landings

The Link 4 Phase-2 submarine cable connects Mentigi and Sungailiat, two coastal towns in Indonesia. Mentigi, located on the island of Lombok, is a growing hub for regional connectivity. Its strategic position near the Lombok Strait makes it a logical choice for a landing point, as the strait serves as a natural corridor for both maritime and data traffic. Sungailiat, on the island of Bangka, is another critical location, known for its role in supporting local industries and communities. By linking these two points, the cable facilitates communication between regions separated by the Java Sea.

The route of the cable crosses a relatively shallow and geologically stable section of the Java Sea, minimizing risks associated with underwater seismic activity. This stability is crucial for maintaining the reliability of the cable. Both landing points are integral to their respective regions, with Mentigi serving as a gateway to eastern Indonesia and Sungailiat supporting connectivity for Bangka Island and its surrounding areas. The cable's presence underscores the importance of localized infrastructure in a nation as geographically fragmented as Indonesia.

Ownership and History

Link 4 Phase-2 is owned and operated by XLSmart, a subsidiary of the Xelcom Group. XLSmart has been a key player in Indonesia's telecommunications sector, providing a range of services to both residential and business customers. The parent company, Xelcom Group, has been active since 1987, building a reputation for delivering reliable communication solutions across the archipelago. The launch of Link 4 Phase-2 in 2005 marked an important milestone in XLSmart's efforts to expand its infrastructure and improve regional connectivity.

The cable's development reflects Indonesia's broader push to modernize its telecommunications network. By focusing on domestic routes like Link 4 Phase-2, XLSmart has contributed to bridging the digital divide within the country. While the cable's current operational status is not explicitly documented, its historical significance and strategic placement continue to highlight its role in Indonesia's telecommunications landscape.

What Our Measurements Show

Our live monitoring of Link 4 Phase-2 provides valuable insights into its performance. Data collected from six measured corridors reveals a best round-trip time (RTT) of 21 milliseconds, indicating low-latency communication under optimal conditions. However, the average RTT of 225 milliseconds suggests variability in performance, which could be influenced by factors such as network congestion or maintenance activities.

The cable's latency metrics are consistent with its role as a regional system serving localized traffic. The relatively short length of 300 kilometers contributes to its ability to deliver low-latency connections, particularly during periods of minimal network load. These measurements underscore the cable's importance in maintaining efficient communication between Mentigi and Sungailiat, supporting both personal and commercial data exchanges in the region.

Health

Status✓ Normal
RTT53.66 ms / base 52.13 ms
Last checked2026-10-14 09:32

Monitored by our probe network. Open monitoring →

RTT History

Route: #6427 → Mentigi Measured: 2026-10-14 09:32
261.5 ms
Min Avg Max #
7 days 261.5 261.5 261.5 1
30 days 261.5 294.9 332.0 26
60 days 1.0 201.6 529.3 106

Health Timeline

Sat, Oct 3
View full event log →
Hop Anomaly
8ms → 352ms (45.82×)
09:30
Thu, Sep 24
View full event log →
Hop Anomaly
6ms → 31ms (5.52×)
13:01
Hop Anomaly
16ms → 90ms (5.71×)
08:31
Tue, Sep 22
View full event log →
Hop Anomaly
21ms → 121ms (5.67×)
21:31
Sat, Sep 19
View full event log →
Hop Anomaly
9ms → 37ms (4.00×)
12:00
Fri, Sep 18
View full event log →
Mentigi
RTT Spike
377ms → 905ms (2.40×)
23:32
Mentigi
RTT Spike
377ms → 905ms (2.40×)
23:32
Wed, Sep 16
View full event log →
Hop Anomaly
14ms → 503ms (36.93×)
13:00
Sun, Sep 13
View full event log →
Hop Anomaly
14ms → 44ms (3.05×)
07:01
Mon, Sep 7
View full event log →
Hop Anomaly
6ms → 946ms (163.28×)
17:30
Sat, Sep 5
View full event log →
Mentigi
RTT Spike
129ms → 260ms (2.01×)
01:31
Mentigi
RTT Spike
121ms → 260ms (2.14×)
01:03
Fri, Sep 4
View full event log →
Mentigi
RTT Spike
114ms → 260ms (2.29×)
14:01
Mentigi
RTT Spike
114ms → 260ms (2.29×)
14:01
Hop Anomaly
12ms → 48ms (3.90×)
12:00
Thu, Sep 3
View full event log →
Hop Anomaly
6ms → 18ms (3.03×)
15:31
Mon, Aug 31
View full event log →
Mentigi
RTT Spike
108ms → 230ms (2.13×)
19:31
Mentigi
RTT Spike
108ms → 230ms (2.13×)
19:31
Tue, Aug 18
View full event log →
Hop Anomaly
71ms → 390ms (5.46×)
08:00
Tue, Aug 11
View full event log →
Hop Anomaly
3ms → 805ms (255.05×)
16:31
Fri, Aug 7
View full event log →
Hop Anomaly
70ms → 432ms (6.21×)
03:03
Mon, Aug 3
View full event log →
Hop Anomaly
5ms → 23ms (4.35×)
21:30
Wed, Jun 24
View full event log →
Hop Anomaly
86ms → 463ms (5.40×)
23:01
Tue, Jun 16
View full event log →
Hop Anomaly
13ms → 643ms (51.03×)
23:01
Sun, Apr 5
View full event log →
Hop Anomaly
6ms → 47ms (7.42×)
07:00

FAQ

What is the length of the Link 4 Phase-2 cable?
The Link 4 Phase-2 submarine cable is 300 km long.
Which countries does Link 4 Phase-2 connect?
Link 4 Phase-2 connects 1 country via 2 landing points.
Who owns the Link 4 Phase-2 cable?
Link 4 Phase-2 is owned by a consortium including XLSmart.
When was Link 4 Phase-2 put into service?
The Link 4 Phase-2 cable entered service in 2005.
Link 4 Phase-2
  • Length300 km
  • StatusIn Service
  • Ready for Service2005

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
Submarine cables Land fiber Live probes
Explore GeoCables: interactive submarine cable map · all 723 submarine cables · live internet latency map · cable landing points worldwide

Log In

Access your routes, favorites, and API key

Create account Forgot password?