350 km · 2 Points d'atterrissage · 1 Pays · Mise en service: 2015
| Longueur | 350 km |
|---|---|
| Statut | En service |
| Mise en service | 2015 |
| Points d'atterrissage | 2 |
| Pays | 1 |
| Emplacement |
|---|
| Puerto Chacabuco, Chile |
| Quellon, Chile |
FOS Quellon-Chacabuco is a submarine cable system that connects two landing points within Chile. The total length of the cable is 350 km, and it was ready for service in 2015.
The cable has two landing points:
The cable is owned by Grupo Gtd.
FOS Quellon-Chacabuco became operational in 2015. The status of the cable remains unknown as of now.
This submarine cable connects two locations within Chile, contributing to the country's internal telecommunications infrastructure and supporting local internet access and enterprise connectivity needs. Chile is a significant market for regional submarine cables due to its strategic position in South America.
Trouvez la distance réelle par câble entre deux villes
Ouvrir le calculateur →