← All articles
Region

Three cables of Mayotte: why only one leads to the mainland

📈 Live RTT from our measurements · last 30 days
Daily average per cable, in ms; red dots mark days with detected anomalies.
05010015020025030016.0823.0830.0806.0913.09Lower Indian Ocean Network 2 (LION2) · 16.08 · 178 msLower Indian Ocean Network 2 (LION2) · 17.08 · 178 msLower Indian Ocean Network 2 (LION2) · 18.08 · 178 msLower Indian Ocean Network 2 (LION2) · 19.08 · 177 msLower Indian Ocean Network 2 (LION2) · 20.08 · 171 msLower Indian Ocean Network 2 (LION2) · 21.08 · 172 msLower Indian Ocean Network 2 (LION2) · 22.08 · 178 msLower Indian Ocean Network 2 (LION2) · 23.08 · 178 msLower Indian Ocean Network 2 (LION2) · 24.08 · 178 msLower Indian Ocean Network 2 (LION2) · 25.08 · 178 msLower Indian Ocean Network 2 (LION2) · 26.08 · 177 msLower Indian Ocean Network 2 (LION2) · 27.08 · 171 msLower Indian Ocean Network 2 (LION2) · 28.08 · 171 msLower Indian Ocean Network 2 (LION2) · 29.08 · 171 msLower Indian Ocean Network 2 (LION2) · 30.08 · 171 msLower Indian Ocean Network 2 (LION2) · 31.08 · 171 msLower Indian Ocean Network 2 (LION2) · 01.09 · 171 msLower Indian Ocean Network 2 (LION2) · 02.09 · 171 msLower Indian Ocean Network 2 (LION2) · 03.09 · 171 msLower Indian Ocean Network 2 (LION2) · 04.09 · 171 msLower Indian Ocean Network 2 (LION2) · 05.09 · 171 msLower Indian Ocean Network 2 (LION2) · 06.09 · 171 msLower Indian Ocean Network 2 (LION2) · 07.09 · 171 msLower Indian Ocean Network 2 (LION2) · 08.09 · 171 msLower Indian Ocean Network 2 (LION2) · 09.09 · 171 msLower Indian Ocean Network 2 (LION2) · 10.09 · 171 msLower Indian Ocean Network 2 (LION2) · 11.09 · 229 msLower Indian Ocean Network 2 (LION2) · 12.09 · 57 msLower Indian Ocean Network 2 (LION2) · 13.09 · 57 msLower Indian Ocean Network 2 (LION2) · 14.09 · 57 msAvassa · 16.08 · 226 msAvassa · 17.08 · 225 msAvassa · 18.08 · 254 msAvassa · 19.08 · 229 msAvassa · 20.08 · 219 msAvassa · 21.08 · 227 msAvassa · 22.08 · 197 msAvassa · 23.08 · 221 msAvassa · 24.08 · 68 msAvassa · 25.08 · 144 msAvassa · 26.08 · 222 msAvassa · 27.08 · 68 msAvassa · 28.08 · 221 msAvassa · 29.08 · 221 msAvassa · 30.08 · 221 msAvassa · 31.08 · 71 msAvassa · 01.09 · 222 msAvassa · 02.09 · 235 msAvassa · 03.09 · 221 msAvassa · 04.09 · 234 msAvassa · 05.09 · 220 msAvassa · 06.09 · 219 msAvassa · 07.09 · 220 msAvassa · 08.09 · 224 msAvassa · 09.09 · 220 msAvassa · 10.09 · 222 msAvassa · 11.09 · 221 msAvassa · 12.09 · 145 msAvassa · 13.09 · 68 msAvassa · 14.09 · 68 msFLY-LION3 · 16.08 · 226 msFLY-LION3 · 17.08 · 225 msFLY-LION3 · 18.08 · 227 msFLY-LION3 · 19.08 · 229 msFLY-LION3 · 20.08 · 228 msFLY-LION3 · 21.08 · 216 msFLY-LION3 · 22.08 · 197 msFLY-LION3 · 23.08 · 145 msFLY-LION3 · 24.08 · 224 msFLY-LION3 · 25.08 · 68 msFLY-LION3 · 26.08 · 220 msFLY-LION3 · 27.08 · 224 msFLY-LION3 · 28.08 · 218 msFLY-LION3 · 29.08 · 222 msFLY-LION3 · 30.08 · 221 msFLY-LION3 · 31.08 · 220 msFLY-LION3 · 01.09 · 235 msFLY-LION3 · 02.09 · 228 msFLY-LION3 · 03.09 · 219 msFLY-LION3 · 04.09 · 228 msFLY-LION3 · 05.09 · 218 msFLY-LION3 · 06.09 · 220 msFLY-LION3 · 07.09 · 220 msFLY-LION3 · 08.09 · 68 msFLY-LION3 · 09.09 · 222 msFLY-LION3 · 10.09 · 222 msFLY-LION3 · 11.09 · 225 msFLY-LION3 · 12.09 · 68 msFLY-LION3 · 13.09 · 222 msFLY-LION3 · 14.09 · 68 ms

Three Cables - Still One Direction

Kaweni, Mayotte
Kaweni, Mayotte - here the cables come ashore · photo on Wikimedia Commons

It's common to say that small islands "hang by a single cable." But this isn't true for Mayotte: it has three submarine cables, and they all come ashore in two different places. However, when you look at where each one goes, the picture changes.

In Kaweni, two arrive. The Lower Indian Ocean Network 2 (LION2) from 2012 is 2700 kilometers to Nyali on the Kenyan coast, that is, the only cable bringing the island to continental trunk lines. The FLY-LION3 from 2019 looks like a second cable but its length is 400 kilometers and it leads to Moroni on the Comoros.

The third cable, Avassa from 2016, arrives in Mamoudzi and also does not lead anywhere off the archipelago: its 260 kilometers connect Mayotte with three Comoros cities - Moroni, Chindini, and Mutsamudu.

This makes a connection of three lines, two of which connect neighbors to each other, while one leads to the world. If LION2 goes silent, the remaining two cables will not pick up international traffic: they will lead it to the Comoros, which themselves exit to trunk lines via foreign routes.

What measurements show

Our distributed measurement network constantly checks the availability of CAVENI: in the archive, there are 532 checks, with an average round-trip delay of 138 milliseconds. For an island in the Indian Ocean, this is a typical value determined by distance: it takes time for the signal to travel thousands of kilometers through glass and return. In a European city, the delay to the nearest neighbor is usually between 20-30 milliseconds.

What matters more is that consistent latency holds as long as one direction works. Therefore, any work on the line to Kenya is more noticeable for the island than an outage on any of the inter-island cables.

Mayotte in Comparison with Neighbors

In our resilience index, Mayotte scores 40 out of 100 and falls into the "vulnerable" class. In the region, the picture is as follows: Madagascar - 75, Mauritius - 68, Comoros - 60, Réunion - 42. The difference is not in the number of cables but in the number of truly independent paths: the index counts them specifically.

From a practical standpoint for the island, a new line makes sense not as "another cable," but as a second direction to the backbone networks. Until it exists, three cables on the map remain one road to the world.

To check the status of routes to Mayotte, you can visit the live map, and to see if your own connection is affected, you can go to the page “Is My Connection Affected”.

🗺 The zone on the live map
Open the full map →
⚓ Cables in this zone: live status
From our monitoring network; baseline is the cable's normal RTT.
CableLengthRFSRTT nowBaselineStatus
FLY-LION3400 km201968 ms-nominal
Avassa260 km201668 ms-nominal
Lower Indian Ocean Network 2 (LION2)2,700 km201257 ms-nominal
Evgeny Korolev
Written by
Evgeny Korolev
Infrastructure Engineer · Founder of GeoCables
Built GeoCables to monitor submarine cables in real time. Runs his own distributed network of measurement servers, including in regions poorly covered by public internet measurements.

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?