Home
Explore What GeoCables can do Cables Locations Map My path ISP status Country resilience Check my connection Blocked websites
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Test yourself Research Guide Methodology Latency Overland links Deployments by year Earthquakes Open dataset API Widgets What's new About Contact
All articles
Chokepoint

Isla Verde: Subsea Cable Hub and Maritime Challenges

Live RTT from our measurements · last 30 days
Daily average per cable, in ms; red dots mark days with detected anomalies.
05010015020025.1031.1007.1114.1121.11Antillas 1 · 25.10 · 74 msAntillas 1 · 25.10 · 148 msAntillas 1 · 26.10 · 93 msAntillas 1 · 27.10 · 104 msAntillas 1 · 28.10 · 110 msAntillas 1 · 29.10 · 84 msAntillas 1 · 30.10 · 137 msAntillas 1 · 31.10 · 137 msAntillas 1 · 01.11 · 77 msAntillas 1 · 02.11 · 106 msAntillas 1 · 03.11 · 136 msAntillas 1 · 04.11 · 137 msAntillas 1 · 05.11 · 56 msAntillas 1 · 06.11 · 57 msAntillas 1 · 07.11 · 67 msAntillas 1 · 08.11 · 77 msAntillas 1 · 09.11 · 76 msAntillas 1 · 10.11 · 67 msAntillas 1 · 11.11 · 57 msAntillas 1 · 12.11 · 141 msAntillas 1 · 13.11 · 57 msAntillas 1 · 14.11 · 77 msAntillas 1 · 15.11 · 57 msAntillas 1 · 16.11 · 73 msAntillas 1 · 17.11 · 57 msAntillas 1 · 18.11 · 76 msAntillas 1 · 19.11 · 57 msAntillas 1 · 20.11 · 66 msARCOS · 25.10 · 70 msARCOS · 25.10 · 70 msARCOS · 27.10 · 70 msARCOS · 28.10 · 70 msARCOS · 29.10 · 70 msARCOS · 31.10 · 70 msARCOS · 02.11 · 70 msARCOS · 04.11 · 70 msARCOS · 05.11 · 70 msARCOS · 06.11 · 70 msARCOS · 07.11 · 66 msARCOS · 08.11 · 147 msARCOS · 09.11 · 70 msARCOS · 10.11 · 64 msARCOS · 11.11 · 58 msARCOS · 12.11 · 141 msARCOS · 13.11 · 58 msARCOS · 14.11 · 70 msARCOS · 15.11 · 60 msARCOS · 16.11 · 64 msARCOS · 17.11 · 60 msARCOS · 18.11 · 70 msARCOS · 19.11 · 154 msARCOS · 20.11 · 131 msARCOS · 21.11 · 70 msPacific Caribbean Cable System (PCCS) · 25.10 · 103 msPacific Caribbean Cable System (PCCS) · 25.10 · 105 msPacific Caribbean Cable System (PCCS) · 26.10 · 100 msPacific Caribbean Cable System (PCCS) · 27.10 · 102 msPacific Caribbean Cable System (PCCS) · 28.10 · 110 msPacific Caribbean Cable System (PCCS) · 29.10 · 99 msPacific Caribbean Cable System (PCCS) · 30.10 · 106 msPacific Caribbean Cable System (PCCS) · 31.10 · 106 msPacific Caribbean Cable System (PCCS) · 01.11 · 105 msPacific Caribbean Cable System (PCCS) · 02.11 · 105 msPacific Caribbean Cable System (PCCS) · 03.11 · 112 msPacific Caribbean Cable System (PCCS) · 04.11 · 103 msPacific Caribbean Cable System (PCCS) · 05.11 · 103 msPacific Caribbean Cable System (PCCS) · 06.11 · 102 msPacific Caribbean Cable System (PCCS) · 07.11 · 102 msPacific Caribbean Cable System (PCCS) · 08.11 · 191 msPacific Caribbean Cable System (PCCS) · 09.11 · 103 msPacific Caribbean Cable System (PCCS) · 10.11 · 97 msPacific Caribbean Cable System (PCCS) · 11.11 · 102 msPacific Caribbean Cable System (PCCS) · 12.11 · 134 msPacific Caribbean Cable System (PCCS) · 13.11 · 102 msPacific Caribbean Cable System (PCCS) · 14.11 · 146 msPacific Caribbean Cable System (PCCS) · 15.11 · 102 msPacific Caribbean Cable System (PCCS) · 16.11 · 99 msPacific Caribbean Cable System (PCCS) · 17.11 · 105 msPacific Caribbean Cable System (PCCS) · 18.11 · 110 msPacific Caribbean Cable System (PCCS) · 19.11 · 108 msPacific Caribbean Cable System (PCCS) · 20.11 · 127 msPacific Caribbean Cable System (PCCS) · 21.11 · 107 msTAM-1 · 25.10 · 54 msTAM-1 · 25.10 · 55 msTAM-1 · 26.10 · 73 msTAM-1 · 27.10 · 61 msTAM-1 · 28.10 · 63 msTAM-1 · 29.10 · 55 msTAM-1 · 30.10 · 72 msTAM-1 · 31.10 · 55 msTAM-1 · 01.11 · 72 msTAM-1 · 02.11 · 54 msTAM-1 · 03.11 · 69 msTAM-1 · 04.11 · 63 msTAM-1 · 05.11 · 54 msTAM-1 · 06.11 · 55 msTAM-1 · 07.11 · 62 msTAM-1 · 08.11 · 54 msTAM-1 · 09.11 · 54 msTAM-1 · 10.11 · 62 msTAM-1 · 11.11 · 69 msTAM-1 · 12.11 · 55 msTAM-1 · 13.11 · 71 msTAM-1 · 14.11 · 96 msTAM-1 · 15.11 · 72 msTAM-1 · 16.11 · 48 msTAM-1 · 17.11 · 71 msTAM-1 · 18.11 · 48 msTAM-1 · 19.11 · 157 msTAM-1 · 20.11 · 128 msTAM-1 · 21.11 · 48 ms

Geometry of the Location: Depths, Shores, Shipping

Isla Verde, located at latitude 18.5000 and longitude -66.0000, serves as a key node for submarine cables in the Caribbean region. Geographically, this location is a coastal area of Puerto Rico where complex marine topography and limited options for cable laying force operators to concentrate routes within a narrow corridor. Deep-sea sections of the Atlantic Ocean transition into relatively shallow coastal waters, making the construction of alternative routes technically challenging and costly. The shores of Puerto Rico are also densely developed, limiting the choice of landing points for cables. Additionally, the region's intense shipping activity requires meticulous route planning to avoid cable damage from anchors and trawls.

What’s Packed In: Main Routes and Their Scale

Thirteen submarine cables pass through Isla Verde, connecting North and South America as well as Caribbean nations. Among them are major routes such as South America-1 (SAm-1), spanning 25,000 km, BRUSA (11,000 km), and ARCOS (8,704 km), which provide connectivity between the United States, Brazil, Panama, Colombia and other countries. Shorter but equally significant routes include GTMO-PR (1,400 km) and Taino-Carib (187 km), linking Puerto Rico with neighboring islands. These cables support not only internet services but also critical infrastructure for financial, medical and governmental systems in numerous countries, including the United States, Brazil, the Dominican Republic and Mexico.

Alternative Corridors: Why They Don’t Help

Theoretically, alternative routes for laying cables exist, such as through the eastern Caribbean Sea or along the Central American coastline. However, these options face several challenges. First, increasing the cable length, as in the case of bypassing through eastern waters, leads to higher construction and operational costs. For example, extending a route by 1,000 km could inflate the project budget by tens of millions of dollars. Second, alternative corridors have their own vulnerabilities. Eastern routes are exposed to risks from tropical storms and hurricanes, while western routes face high seismic activity along the Central American coast. Thus, the region's geography effectively compels operators to concentrate cables within the narrow Isla Verde zone.

Break Scenario Step by Step

In the event of a break in one or more cables in the Isla Verde area, the consequences would be felt immediately. In the first few hours, traffic routes would be redirected through backup cables, increasing latency (RTT). For instance, communication between the United States and Brazil might be rerouted via longer paths, such as through Europe, adding tens of milliseconds to response times. Within the first 24 hours, operators would begin assessing the damage and devising a repair plan. If the break affects major cables like SAm-1 or BRUSA, restoration could take weeks due to their length and complexity. During this time, countries such as Puerto Rico, Brazil and the Dominican Republic would face challenges in accessing international resources, including cloud services and financial systems.

What GeoCables Monitors

GeoCables closely monitors the situation in the Isla Verde area. We track the status of all 13 cables, including major routes like SAm-1, BRUSA and ARCOS, as well as shorter paths like Taino-Carib and SMPR-1. The area is also monitored for vessels that may pose threats to cables, such as through anchoring operations. Our systems enable the rapid detection of latency (RTT) changes and anomalies in cable performance. Over the past 30 days, one anomaly was recorded, which did not result in significant disruptions. Continuous monitoring minimizes risks and ensures swift responses to any incidents, which is especially critical in a narrow and congested corridor like Isla Verde.

The zone on the live map
Open the full map →
Cables in this zone: live status
From our monitoring network; baseline is the cable's normal RTT.
CableLengthRFSRTT nowBaselineStatus
Antillas 1601 km1997--nominal
TAM-17,200 km202621 ms-nominal
ARCOS8,704 km200153 ms-nominal
Pacific Caribbean Cable System (PCCS)6,163 km201568 ms-nominal
Americas-II West-2000--nominal
South America-1 (SAm-1)25,000 km2001129 ms-nominal
Sint Maarten Puerto Rico Network One (SMPR-1)375 km2004--nominal
Southern Caribbean Fiber3,000 km200645 ms-nominal
Evgeny Korolev
Written by
Evgeny Korolev
Infrastructure Engineer · Founder of GeoCables
Built GeoCables to monitor submarine cables in real time. Runs his own distributed network of measurement servers, including in regions poorly covered by public internet measurements.
Advertisement

Log In

Access your routes, favorites, and API key

Create account Forgot password?