Internet status in Benin Operational
Country-level signal dip: 0% · 2026-06-07 23:07:21 UTC
Leading providers
| Provider | ASN | Population share | Status | Signal dip |
|---|---|---|---|---|
| SPACETEL BENIN SA - SPACETEL BENIN SA | AS37424 | 45.16% | Operational · country signal | — |
| SOCIETE BENINOISE D'INFRASTRUCTURES NUMERIQUES - SOCIETE BENINOISE D'INFRASTRUCTURES NUMERIQUES | AS328228 | 42.48% | Operational · country signal | — |
| ETISALAT BENIN - ETISALAT BENIN | AS37136 | 24.02% | Operational · country signal | — |
| GVA Cote d'Ivoire SAS - GVA Cote d'Ivoire SAS | AS36924 | 3.42% | Operational · country signal | — |
| Space Exploration Technologies Corporation | AS14593 | 1.93% | Operational | 1% |
Per-ISP signals are measured when the country shows anomalies (and continuously for pilot countries); «No data» means no anomaly drill has been needed recently.
ℹ️ How to read this page
Operational — signal at normal levels for this country / provider
Degraded — signal dip ≥20% below its 24h baseline — partial outage or major disturbance
Major outage — dip ≥50% — large-scale loss of connectivity
“Signal dip” compares the current BGP-visibility and active-probing levels against the median of the previous 24 hours, corrected for global measurement artifacts (a worldwide simultaneous drop is ignored).
Data refreshes hourly. Per-ISP rows are measured in depth when the country shows an anomaly (pilot countries — continuously). The probable cause is a heuristic: an active fault on a submarine cable feeding the country ranks first, then routing signals, then power/access patterns.
Degraded — signal dip ≥20% below its 24h baseline — partial outage or major disturbance
Major outage — dip ≥50% — large-scale loss of connectivity
“Signal dip” compares the current BGP-visibility and active-probing levels against the median of the previous 24 hours, corrected for global measurement artifacts (a worldwide simultaneous drop is ignored).
Data refreshes hourly. Per-ISP rows are measured in depth when the country shows an anomaly (pilot countries — continuously). The probable cause is a heuristic: an active fault on a submarine cable feeding the country ranks first, then routing signals, then power/access patterns.
Sources: APNIC population-per-AS estimates · IODA (Georgia Tech) BGP & active-probing signals · GeoCables submarine-cable telemetry. Status is heuristic, not an official provider statement.