Home
Explore Cables Locations Map ISP status Shutdowns
Live Live Map Health Latency Pulse Big screen 🖥
Learn Research Guide Methodology
HomeLocationsCroatia › Dubrovnik, Croatia

Dubrovnik, Croatia

Landing Point · HR Croatia

1 Connected Cables 42.6419°N 18.1064°E Croatia
1
Connected Cables
HR
Country
42.64°
Latitude
18.11°
Longitude
Ctrl + Scroll to zoom
👆 Tap to interact with map

Connected Cables

Cable Length RFS Status
Adria-1 440 km 1996 Active

📡 Live Performance

345
measurements
14
probes
97
days monitored
88.1
ms avg RTT
1
anomalies

RTT measurements to this landing point from 2026-04-12 through 2026-07-18 - live ICMP round-trip time via our monitoring probes. Recomputed daily.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#2851 control probe 101 79.2 ms 43.0-214.4 2026-07-15
#1015313 own probe Sevastopol UA 50 80.4 ms 68.9-102.2 2026-06-05
#6427 own probe Sydney AU 49 242.0 ms 240.8-265.2 2026-07-10
#1015932 own probe Odessa UA 49 63.1 ms 54.2-69.6 2026-07-10
#7529 control probe 36 20.8 ms 19.8-28.3 2026-07-02
#11779 control probe 33 17.0 ms 14.6-26.7 2026-07-18
#1014473 own probe Minsk BY 6 79.2 ms 76.1-84.2 2026-07-10
#1014589 own probe Almaty KZ 5 107.2 ms 103.5-117.4 2026-05-06
#1014597 own probe Tbilisi GE 5 56.2 ms 54.3-59.0 2026-05-06
#1014969 own probe Jerusalem IL 5 75.1 ms 73.6-79.7 2026-05-06
#1016031 own probe Kyiv UA 3 26.7 ms 26.6-26.9 2026-07-10
#6410 own probe Sao Paulo BR 1 244.1 ms 244.1-244.1 2026-07-10
#1015523 own probe Moscow RU 1 44.1 ms 44.1-44.1 2026-05-06
#1015563 own probe Saint Petersburg RU 1 80.8 ms 80.8-80.8 2026-05-06

About Dubrovnik, Croatia

Dubrovnik, Croatia
Photo: Wikimedia Commons ↗

Dubrovnik: A Gateway to Connectivity in Southern Dalmatia

Dubrovnik, Croatia, known for its stunning medieval architecture and UNESCO World Heritage status, is more than just a jewel of the Adriatic-it is also a key submarine cable landing point. While Croatia’s overall submarine cable infrastructure is modest, with only two cables landing at two points, Dubrovnik plays a unique role in connecting the region to international networks.

The Adria-1 Cable: Linking Dubrovnik to Albania and Greece

The Adria-1 cable, which has been operational since 1996, is the sole submarine cable landing in Dubrovnik. Spanning 440 kilometers, this cable connects Dubrovnik to two other landing points: Corfu in Greece and Durres in Albania. This chain forms an important regional link across the Adriatic and Ionian Seas. Unlike Umag, Croatia’s other cable landing point further north, Dubrovnik’s connectivity is positioned to serve southern Dalmatia, bridging Croatia to its southeastern neighbors. While the Adria-1 cable does not directly connect Dubrovnik to global hubs, it provides a critical regional trunk that feeds into broader international networks via Greece and Albania. This regional focus aligns well with Dubrovnik’s geographic position near the southern tip of Croatia, making it an essential node for cross-border communication.

Latency Insights: Dubrovnik’s Performance

GeoCables’ proprietary latency measurements reveal Dubrovnik’s connectivity performance through the Adria-1 cable. With 346 completed checks from 20 source cities, the average round-trip latency to Dubrovnik is 90 milliseconds, while the best observed latency is an impressive 7 milliseconds. These numbers highlight the cable’s reliability and efficiency in serving the region, particularly for time-sensitive applications.

Dubrovnik’s Dual Identity: Tourism and Connectivity

Dubrovnik is internationally renowned as a tourist destination, drawing visitors to its historic Old City and picturesque coastline. However, its role as a submarine cable landing point underscores the city’s importance beyond tourism. The Adria-1 cable supports local industries, government operations, and residents by providing stable regional connectivity. While Dubrovnik is not a major industrial hub, its seaport and administrative significance make reliable communication essential.

Positioning Dubrovnik in Croatia’s Cable Network

Croatia’s submarine cable infrastructure is limited, with only two cables landing at Umag and Dubrovnik. The average cable length in the country is 335 kilometers, and the first cable became operational in 1994. Dubrovnik’s Adria-1 cable stands out for its international reach, connecting Croatia to Albania and Greece, whereas Umag’s cable serves the northern part of the country. This division reflects Croatia’s geographic diversity, with Dubrovnik acting as a southern anchor in the nation’s connectivity map.

Conclusion

Dubrovnik’s role as a submarine cable landing point may not be as prominent as its reputation as a Mediterranean tourist hotspot, but it is an essential piece of the region’s telecommunications puzzle. Through the Adria-1 cable, Dubrovnik connects southern Croatia to Albania and Greece, ensuring the city remains plugged into the wider world. As Croatia continues to balance its historic charm with modern infrastructure, Dubrovnik’s connectivity will remain a quiet yet significant part of its story.

Other Landing Points in Croatia

Landing Point

  • CountryHR Croatia
  • Coordinates42.6419°N 18.1064°E
  • Connected Cables1

See Real Cable Routes

View actual submarine cable routing from Dubrovnik, Croatia - with backbone nodes, distance calculations, and latency estimates

Open Calculator →
🌊 Submarine cables 🛤 Land fiber 📡 Live probes
Explore GeoCables: interactive submarine cable map · all 700+ submarine cables · live internet latency map · cable landing points worldwide · internet & ISP outages in Croatia

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?