Landing Point · EG Egypt
| Cable | Status |
|---|---|
| Africa-1 | Active |
| EAGLE | Planned |
| India Europe Xpress (IEX) | Active |
RTT measurements to this landing point from 2026-03-28 through 2026-09-27 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.
| Probe | Location | Samples | Avg |
|---|---|---|---|
| own probe | Jerusalem IL | 28 | 217.8 ms |
| #6427 own probe | Sydney AU | 25 | 332.2 ms |
| own probe | Sevastopol UA | 23 | 248.5 ms |
| #1007439 | control probe | 18 | 189.9 ms |
| own probe | Balancer IL | 7 | 117.7 ms |
| #6410 own probe | Sao Paulo BR | 5 | 252.0 ms |
| own probe | Almaty KZ | 4 | 172.5 ms |
| own probe | Tbilisi GE | 4 | 125.9 ms |
| own probe | Minsk BY | 3 | 114.9 ms |
| own probe | Odessa UA | 3 | 86.7 ms |
| own probe | Moscow RU | 2 | 96.0 ms |

Sidi Kerir, Egypt is a submarine cable landing point in Egypt (coordinates 31.0476°, 29.6724°). It serves 3 submarine cable systems, making it a multi-cable landing site in Egypt's international connectivity infrastructure.
The Sumed Pipeline is an oil pipeline in Egypt, running from the Ain Sokhna terminal in the Gulf of Suez, the northernmost terminus of the Red Sea, to offshore Sidi Kerir port, Alexandria in the Mediterranean Sea. It provides an alternative to the Suez Canal for transporting oil from the Persian Gulf region to the Mediterranean. Wikipedia
| Cable | RFS | Length | Owners |
|---|---|---|---|
| EAGLE | 2028 | 2,000 km | 4iG Group, Telecom Egypt |
| Africa-1 | 2026 | 10,000 km | G42, Mobily, Pakistan Telecommunications Company Ltd., … |
| India Europe Xpress (IEX) | 2026 | 9,775 km | China Mobile, Reliance Jio Infocomm |
Cables landing at Sidi Kerir, Egypt are operated by 10 distinct consortium partners and carriers, including 4iG Group, China Mobile, G42, Mobily, Pakistan Telecommunications Company Ltd., Reliance Jio Infocomm, TeleYemen, Telecom Egypt, Zain Omantel International, e&. Each cable is typically jointly owned by a consortium of tier-one carriers and hyperscale operators who share construction costs and capacity; the operator mix reflects both regional incumbents and global players with interest in the routes served by this landing point.
From Sidi Kerir, Egypt, international traffic can reach 15 countries through 3 cable systems. Destinations include Albania, Algeria, Djibouti, Egypt, France, Greece, India, Italy and 7 more.
No monitoring incidents were recorded on cables serving Sidi Kerir, Egypt in the past 90 days - all connected systems remained within normal latency thresholds. Our monitoring network continuously samples latency from external probes to targets reachable via these cables.
What next: Sidi Kerir, Egypt in the global directory of cable landing points; see surrounding routes on the interactive submarine cable map or follow live network monitoring.
Significant incidents on cables landing here, each with its own report.
View actual submarine cable routing from Sidi Kerir, Egypt - with backbone nodes, distance calculations, and latency estimates
Open Calculator →