Home
Explore Cables Locations Map ISP status Shutdowns
Live Live Map Health Latency Pulse Big screen 🖥
Learn Research Guide Methodology
HomeLocationsChile › Meimen, Chile

Meimen, Chile

Landing Point · CL Chile

1 Connected Cables 41.8069°S 73.1553°W Chile
1
Connected Cables
CL
Country
41.81°
Latitude
73.16°
Longitude
Ctrl + Scroll to zoom
👆 Tap to interact with map

Connected Cables

Cable Length RFS Status
Segunda FOS Canal de Chacao 40 km 2015 Active

📡 Live Performance

26
measurements
10
probes
64
days monitored
274.5
ms avg RTT
0
anomalies

RTT measurements to this landing point from 2026-04-25 through 2026-06-29 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#1014589 own probe Almaty KZ 5 315.1 ms 309.4-323.4 2026-06-29
#6410 own probe Sao Paulo BR 3 53.5 ms 52.9-53.9 2026-06-29
#6427 own probe Sydney AU 3 332.6 ms 322.5-344.9 2026-06-29
#6487 own probe Singapore SG 3 313.5 ms 303.9-322.0 2026-06-29
#7062 own probe Cape Town ZA 3 350.0 ms 348.7-350.7 2026-06-29
#1014473 own probe Minsk BY 2 248.1 ms 246.4-249.8 2026-05-20
#1014597 own probe Tbilisi GE 2 278.1 ms 272.5-283.6 2026-05-20
#1014969 own probe Jerusalem IL 2 266.7 ms 258.3-275.1 2026-05-20
#1015523 own probe Moscow RU 2 263.2 ms 259.8-266.6 2026-05-20
#1015313 own probe Sevastopol UA 1 301.1 ms 301.1-301.1 2026-04-25

About Meimen, Chile

Meimen, Chile: A Small Yet Strategic Link

Meimen, Chile, is a modest yet significant submarine cable landing point located in the southern part of the country. Hosting just one cable, the Segunda FOS Canal de Chacao, Meimen plays a unique role in Chile's connectivity landscape. While larger hubs like Valparaíso boast six cables, Meimen's single connection is part of a domestic chain that ties together the region's coastal infrastructure.

The Segunda FOS Canal de Chacao Cable

The Segunda FOS Canal de Chacao cable, which became operational in 2015, spans a short distance of 40 km. It connects Meimen to Linao, another landing point in Chile. Unlike international cables that link Chile to other countries, this cable serves a purely domestic purpose, ensuring reliable connectivity within the region. The cable’s short length reflects its localized role, stitching together communities on either side of the Chacao Channel.

Regional Context

Chile’s submarine cable network is distributed across 19 landing points, with Meimen hosting just one of the country’s nine cables. This places Meimen in the top 84% of landing points by cable count, though it remains overshadowed by larger hubs like Valparaíso, Arica, and Puerto Montt. These hubs serve as gateways for international connectivity, while Meimen focuses on strengthening regional links. Meimen’s role is particularly interesting when compared to other single-cable landing points such as Antofagasta, Caldera, and Cartagena. While these points often serve as endpoints for international cables, Meimen’s cable is entirely domestic, emphasizing its importance in regional infrastructure rather than global connectivity.

Latency Insights

GeoCables’ latency measurements provide a unique perspective on Meimen’s connectivity. Across 26 completed checks from 10 source cities, the average round-trip latency to Meimen is 275 ms, with the best observed latency at 53 ms. These figures highlight the efficiency of the cable’s operations, even in a relatively remote location. The low latency is particularly noteworthy given the cable’s short length and domestic focus, ensuring swift data transmission between Meimen and Linao.

Meimen’s Role in Local Connectivity

Meimen’s position as a landing point for the Segunda FOS Canal de Chacao underscores its importance in connecting communities across the Chacao Channel. While it may not serve international traffic, this cable is a key piece of infrastructure for the region, enabling communication and data transfer between coastal towns. The cable’s reliability ensures that local industries, schools, and residents can stay connected, even in a geographically challenging area.

A Quiet Yet Essential Link

Though Meimen may lack the scale and international reach of Chile’s larger landing points, its role in regional connectivity is undeniable. The Segunda FOS Canal de Chacao cable ensures that this small landing point remains a key player in the local network, supporting the communities that depend on seamless communication across the Chacao Channel. In the broader context of Chile’s submarine cable infrastructure, Meimen exemplifies the importance of localized connectivity in a country defined by its long coastline and diverse geography.

Other Landing Points in Chile

Landing Point

  • CountryCL Chile
  • Coordinates41.8069°S 73.1553°W
  • Connected Cables1

See Real Cable Routes

View actual submarine cable routing from Meimen, Chile - with backbone nodes, distance calculations, and latency estimates

Open Calculator →
🌊 Submarine cables 🛤 Land fiber 📡 Live probes
Explore GeoCables: interactive submarine cable map · all 700+ submarine cables · live internet latency map · cable landing points worldwide · internet & ISP outages in Chile

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?