Landing Point · SE Sweden
| Cable | Status |
|---|---|
| N0r5ke Viking 2 | Planned |
| Norfest | Active |
Capri Strand, Sweden is a submarine cable landing point in Sweden (coordinates 58.9683°, 11.1184°). It serves 2 submarine cable systems, making it a multi-cable landing site in Sweden's international connectivity infrastructure.
| Cable | RFS | Length | Owners |
|---|---|---|---|
| N0r5ke Viking 2 | 2028 | 900 km | NOR5KE Fibre AS |
| Norfest | 2023 | 749 km | Tampnet |
Cables landing at Capri Strand, Sweden are operated by 2 distinct consortium partners and carriers, including NOR5KE Fibre AS, Tampnet. Each cable is typically jointly owned by a consortium of tier-one carriers and hyperscale operators who share construction costs and capacity; the operator mix reflects both regional incumbents and global players with interest in the routes served by this landing point.
From Capri Strand, Sweden, international traffic can reach 2 countries through 2 cable systems. Destinations include Norway, Sweden.
No monitoring incidents were recorded on cables serving Capri Strand, Sweden in the past 90 days — all connected systems remained within normal latency thresholds. Our monitoring network continuously samples latency from external probes to targets reachable via these cables.
View actual submarine cable routing from Capri Strand, Sweden — with backbone nodes, distance calculations, and latency estimates
Open Calculator →