Home
Explore Cables Locations Map ISP status Transit map Country resilience Check my connection
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Research Guide Methodology Latency Overland links Deployments by year Pulse Open dataset API Widgets What's new About Contact
BackMy connectionResilience index

Capri Strand, Sweden

Landing Point · SE Sweden

2 Connected Cables 58.9683°N 11.1184°E Sweden
2
Connected Cables
SE
Country
58.97°
Latitude
11.12°
Longitude
Ctrl + Scroll to zoom
Tap to interact with map

Connected Cables

Cable Length RFS Status
N0r5ke Viking 2 900 km 2028 Planned
Norfest 749 km 2023 Active

Live Performance

136
measurements
11
probes
188
days monitored
56.1
ms avg RTT
0
anomalies

RTT measurements to this landing point from 2026-04-11 through 2026-10-17 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#2667 control probe 96 46.6 ms 27.5-69.7 2026-10-17
own probe Minsk BY 8 19.5 ms 19.2-19.9 2026-07-29
#6410 own probe Sao Paulo BR 4 199.2 ms 197.8-200.2 2026-07-29
#6427 own probe Sydney AU 4 259.5 ms 258.1-262.9 2026-07-29
own probe Tbilisi GE 4 61.8 ms 60.7-62.5 2026-05-17
own probe Jerusalem IL 4 74.2 ms 71.5-76.7 2026-05-17
own probe Sevastopol UA 4 50.7 ms 44.6-56.6 2026-06-01
own probe Moscow RU 4 19.2 ms 18.4-20.1 2026-07-29
own probe Almaty KZ 3 69.0 ms 68.1-70.3 2026-04-30
own probe Kyiv UA 3 32.0 ms 31.9-32.2 2026-07-29
own probe Saint Petersburg RU 2 15.5 ms 15.5-15.5 2026-07-20

About Capri Strand, Sweden

Capri Strand: A Gateway to Norway

Capri Strand, located on Sweden's coastline, serves as a key landing point for two submarine cables that connect Sweden to Norway. While it may not boast the highest number of cables among Sweden's 28 landing points, its strategic role in linking the two nations makes it noteworthy. The cables landing here - N0r5ke Viking 2 and Norfest - are integral to regional connectivity, bridging Sweden and Norway across the North Sea.

The Cables That Land Here

The Norfest cable, operational since 2023, spans 749 km and connects Capri Strand to nine landing points in Norway, including Oslo, Stavanger, and Kristiansand. This network forms a dense web of connectivity along Norway's coastline, ensuring robust communication links between the two countries. The N0r5ke Viking 2 cable, set to be ready for service in 2028, will add another 900 km of connectivity, further solidifying this cross-border connection. With six landing points in Norway, including Bergen and Stavanger, this cable promises to enhance the already strong ties between Sweden and its western neighbor.

Capri Strand's Role in Sweden's Cable Network

Sweden hosts a total of 28 submarine cables spread across 28 landing points, with an average cable length of 304 km. Capri Strand, with its two cables, ranks among the top 90% of landing points in the country by cable count. While it is not as prominent as other Swedish hubs like Stockholm, Visby, or Farosund - each hosting three cables - Capri Strand holds its own as a reliable link in Sweden's international connectivity.

Latency Insights

GeoCables' unique latency measurements highlight Capri Strand's performance in global connectivity. With an average round-trip latency of 52 ms and a best-observed latency of 18 ms, this landing point demonstrates efficient communication speeds. These metrics underscore its reliability as a node in Sweden's cable infrastructure.

Regional and International Connectivity

Capri Strand's cables do not connect directly to other international destinations beyond Norway, but they play a pivotal role in regional integration. The Norfest cable, for instance, stitches together Norway's coastal cities, while the N0r5ke Viking 2 cable will further enhance this network upon completion. Together, these cables ensure that Sweden's west coast remains well-connected to its neighbor, supporting industries, commerce, and communication between the two nations. In the broader context of Sweden's cable network, Capri Strand may not be the largest or most connected landing point, but its role in linking Sweden and Norway is undeniable. As the N0r5ke Viking 2 cable comes online in 2028, Capri Strand's importance in regional connectivity is set to grow even further.

What next: Capri Strand, Sweden in the global directory of cable landing points; see surrounding routes on the interactive submarine cable map or follow live network monitoring.

Our measurements to Capri Strand

Traceroutes from our own measurement points over the last 30 days: usual delay and number of network hops on the way to Capri Strand.

  • From RIPE Atlas probes: 12 ms, 15 hops, 9 traces

Last trace: 2026-10-16. Live network map

Other Landing Points in Sweden

Landing Point

  • CountrySE Sweden
  • Coordinates58.9683°N 11.1184°E
  • Connected Cables2

See Real Cable Routes

View actual submarine cable routing from Capri Strand, Sweden - with backbone nodes, distance calculations, and latency estimates

Open Calculator →
Submarine cables Land fiber Live probes
Explore GeoCables: interactive submarine cable map · all 723 submarine cables · live internet latency map · cable landing points worldwide · internet & ISP outages in Sweden

Log In

Access your routes, favorites, and API key

Create account Forgot password?