Home
Explore What GeoCables can do Cables Locations Map My path ISP status Country resilience Check my connection Blocked websites
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Test yourself Research Guide Methodology Latency Overland links Deployments by year Earthquakes Open dataset API Widgets What's new About Contact
BackMy connectionResilience index

Annie's Bay, Bermuda

Landing Point · BM Bermuda

3 connected cables 32.3616°N 64.6592°W Bermuda
3
Connected Cables
BM
Country
32.36°
Latitude
64.66°
Longitude
Ctrl + Scroll to zoom
Tap to interact with map

Connected Cables

Cable Length RFS Status
Canoa not announced not announced Planned
Nuvem 7,194 km 2026 Active
Sol 8,153 km 2027 Planned

Measurements

27
measurements
9
probes
192
days monitored
178.3
ms avg RTT
0
anomalies

Latency measurements from 2026-04-13 to 2026-10-22. No new measurements since 2026-10-22. ✓ No anomalies detected in the monitored period.

About Annie's Bay, Bermuda

Have a photo of this place?

Places open to everyone are welcome: a cable marker, the beach, a building from outside. Please do not photograph restricted sites or people. The photo appears after review.

Annie's Bay: Bermuda's Gateway to Global Connectivity

Annie's Bay, located on the picturesque island of Bermuda, is one of the nation's three submarine cable landing points. Although it hosts fewer cables than St. David’s, which leads the region with three, Annie's Bay plays a significant role in Bermuda's international connectivity with two major cables: Sol and Nuvem. Together, these cables link Bermuda to Europe and the United States, solidifying its position as a key node in transatlantic communication.

Two Cables, Two Continents

The Sol cable, set to be ready for service in 2027, spans an impressive 8153 km and connects Annie's Bay to Palm Coast in the United States, Santander in Spain, and São Miguel in Portugal. Similarly, the Nuvem cable, slightly shorter at 7194 km and scheduled for completion in 2026, links Bermuda to Myrtle Beach in the United States, São Miguel, and Sines in Portugal. These connections make Annie's Bay a strategic landing point, bridging North America and Europe. While Annie's Bay may not have the cable density of St. David’s, its role is no less significant. Paget, Bermuda’s other landing point, hosts only one cable, underscoring Annie's Bay's importance as a mid-tier hub in the island's overall infrastructure. With six cables spread across Bermuda’s three landing points, Annie's Bay ranks in the top 67% for cable count, reflecting its contribution to the island's connectivity ecosystem.

A Measured Link to the World

GeoCables’ latency monitoring reveals that Annie's Bay offers reliable and efficient connectivity. Across 48 completed checks from 10 source cities, the average round-trip latency stands at 160 ms, with the best observed latency at 137 ms. These numbers highlight the performance of the cables landing here, ensuring Bermuda remains well-connected to its international partners.

Positioning Bermuda in the Global Network

Bermuda's submarine cable infrastructure is a testament to its strategic location in the Atlantic Ocean. With an average cable length of 7008 km and a history of connectivity dating back to 2000, the island has established itself as a key player in transatlantic communication. Annie's Bay contributes to this legacy by hosting two long-haul cables that are integral to Bermuda's role in international data exchange. While Annie's Bay may not be the busiest landing point on the island, its connections to both Europe and North America ensure that Bermuda remains a critical link in the global network. For a small island nation, this connectivity is essential for industries ranging from finance to tourism, enabling Bermuda to thrive in the digital age.

What next: Annie's Bay, Bermuda in the global directory of cable landing points; see surrounding routes on the interactive submarine cable map or follow live network monitoring.

Our measurements to Annie's Bay

Traceroutes from our own measurement points over the last 30 days: usual delay and number of network hops on the way to Annie's Bay.

  • From RIPE Atlas probes: 98 ms, 19 hops, 30 traces

Last trace: 2026-11-22. Live network map

Other Landing Points in Bermuda

Landing Point

  • CountryBM Bermuda
  • Coordinates32.3616°N 64.6592°W
  • Connected Cables3

See Real Cable Routes

View actual submarine cable routing from Annie's Bay, Bermuda - with backbone nodes, distance calculations, and latency estimates

Open Calculator →
Submarine cables Land fiber Live probes
Explore GeoCables: interactive submarine cable map, all 728 submarine cables, live internet latency map, cable landing points worldwide, internet and ISP outages in Bermuda
Advertisement

Log In

Access your routes, favorites, and API key

Create account Forgot password?