Home
Explore Cables Locations Map ISP status Shutdowns
Live Live Map Health Latency Deployments by year Pulse Big screen 🖥
Learn Research Guide Methodology
Incident report · 2026071801

Malaysia-Cambodia-Thailand (MCT) Cable: 0.86× baseline latency

Resolved · 2h 0m

What we measured

CableMalaysia-Cambodia-Thailand (MCT) Cable
SegmentRayong, TH → Cherating, MY
Detected2026-07-18 10:31 UTC
Resolved2026-07-18 12:32 UTC
Duration2h 0m
Observed latency34.8 ms
Baseline40.2 ms · 0.86×
Increase+134%
Severitywarning

Path analysis

Traffic changed route while latency was elevated. A reroute of this kind usually follows a fault somewhere on the original path.

Cross-probe verdict. Too few independent vantage points were watching this endpoint to reach a cross-probe verdict.

Timeline

Detection method

Latency is sampled continuously from our probe network. An alert opens when round-trip time to a monitored endpoint holds above its rolling baseline, and closes automatically once it returns. Full method is described on the methodology page.

How to cite

GeoCables (2026). Incident 2026071801: Malaysia-Cambodia-Thailand (MCT) Cable. https://geocables.com/incident/2026071801

Embed this map

<iframe src="https://geocables.com/embed.php?type=map&id=malaysia-cambodia-thailand-mct-cable" width="640" height="420" frameborder="0" loading="lazy" style="border:0;border-radius:10px"></iframe>

← All cable events

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?