Home
Explore What GeoCables can do Cables Locations Map My path ISP status Country resilience Check my connection Blocked websites
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Research Guide Methodology Latency Overland links Deployments by year Pulse Open dataset API Widgets What's new About Contact

Hachijojima-Mainland

In Service

2 landing points · 1 country · Ready for Service: 2008

Follow Hachijojima-Mainland
In TelegramCheck my routeAlerts for incidents on this cable and outages in its countries.
Ask about this
Answers come from the data on this site; the assistant does not know anything else.

Reliability passport

Partial passport: 23 measurements in the last year, the index is approximate.

100 out of 100
Reliability index
85%
Stability
checks within 1.2x of the route baseline, last 365 days
0
Significant incidents
last 365 days
18
Age
years in service, typical design life 25
0
Countries routing through it
would see a longer path if it broke
120102030405062026-07: 100%, n=15072026-08: 67%, n=3082026-09: 50%, n=5091011

Share of stable checks by month; marks are significant incidents

How the index is computed

100 minus: anomalous checks share x 300 (max 30); significant incidents x 8 (max 40); (95th percentile of latency to baseline - 1.3) x 50 when above 1.3 (max 15); (age - 20 years) x 1.5 when older than 20 (max 15). Latency is measured as a ratio to each route's own baseline, so cables of different length compare fairly. A significant incident is unavailability or a latency peak of 1.5x lasting an hour or more, confirmed by more than one vantage point.

Ctrl + Scroll to zoom
Tap to interact with map

Specifications

StatusIn Service
Ready for Service2008
Landing Points2
Countries1

Owners

NTT

Internet outages by country

Japan
Advertisement
Advertisement

Landing Points (2)

Location Country Position
Hachijo, Japan JP Japan 33.1123°, 139.7968°
Miura, Japan JP Japan 35.1442°, 139.6208°

If this cable is cut

What each country and landing point keeps if Hachijojima-Mainland goes down. A calculation from our cable and landing-point database, not a forecast.

CountryOther international cablesLand linksWhat remains
Japan34 no reserve of 34 cables

Landing points with no other cable nearby

Every landing point of this cable has another cable within 50 km.

No alerts from our monitoring on this cable in the last 180 days. Events feed →

Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.

Measurements

23
measurements
4
probes
62
days monitored
252.0
ms avg RTT
0
anomalies

Latency measurements from 2026-07-21 to 2026-09-22. No new measurements since 2026-09-22. ✓ No anomalies detected in the monitored period.

About the Hachijojima-Mainland Cable System

Overview of the Hachijojima-Mainland Submarine Cable

The Hachijojima-Mainland submarine cable is a key telecommunications link owned by NTT, connecting Hachijojima Island to mainland Japan. Operational since 2008, the cable ensures reliable communication between these two regions, supporting both local and international data traffic.

Geography and Landing Points

The cable spans between two landing points:

  • Hachijo, Japan - Located on Hachijojima Island, this point connects the island to the broader network infrastructure.
  • Miura, Japan - Situated on mainland Japan, this landing point serves as the gateway for data traffic to and from Hachijojima.
Route: Hachijojima Island → Miura, Japan

Architecture and Technical Specifications

The Hachijojima-Mainland cable was ready for service in 2008, but detailed technical specifications such as its length, fiber pair count, and total capacity remain publicly undisclosed. The supplier responsible for its construction has also not been made available. Despite the lack of granular details, the cable plays a critical role in maintaining connectivity for Hachijojima Island.

Regional Importance

This cable is vital for the connectivity of Hachijojima Island, providing a direct link to mainland Japan. It serves as a critical infrastructure component for redundancy and route diversity in the region. While it does not directly connect to international networks, it complements other regional cables such as Okinawa-Miyakojima-Ishigaki and Yuza-Tobishima, strengthening Japan’s domestic communication network. The cable helps mitigate risks associated with single points of failure and ensures uninterrupted communication for the island's residents and businesses.

What Is Known and What Remains Unclear

Known facts about the Hachijojima-Mainland cable include its ownership by NTT, its operational status since 2008, and its landing points at Hachijo and Miura. However, several key details remain publicly undisclosed:

  • Exact cable length
  • Total capacity (in Tbps)
  • Number of fiber pairs
  • Supplier responsible for its construction

Why This Cable Is Significant for GeoCables Monitoring

From a monitoring perspective, the Hachijojima-Mainland cable is an interesting subject due to its role in connecting a remote island to Japan’s mainland infrastructure. GeoCables could focus on monitoring BGP routing paths to identify potential latency issues or disruptions. Additionally, tracking vessel activity along the cable's route could provide insights into risks such as anchor dragging or accidental damage. Correlating network degradation with environmental or human activity could further enhance predictive maintenance strategies.

Conclusion

The Hachijojima-Mainland submarine cable is a crucial domestic link for Japan, connecting the remote Hachijojima Island to the mainland. While many technical details remain undisclosed, its importance in ensuring reliable connectivity cannot be overstated. For GeoCables, this cable offers an opportunity to enhance risk assessment and monitoring practices, contributing to the resilience of regional network infrastructure.

What next: Explore Hachijojima-Mainland on the interactive submarine cable map, browse the full catalog of submarine cables, or follow live network events and real-world internet latency.

Health

Status✓ Normal
RTT291.59 ms / base 284.44 ms
Last checked2026-09-22 10:32

Monitored by our probe network. Open monitoring →

RTT History

Health Timeline

Wed, Jul 22
View full event log →
Hop Anomaly
16ms → 406ms (25.64×)
03:03
Tue, Jul 21
View full event log →
Hop Anomaly
6ms → 80ms (12.42×)
19:00
Hop Anomaly
7ms → 54ms (7.71×)
14:31

FAQ

Which countries does Hachijojima-Mainland connect?
Hachijojima-Mainland connects 1 country via 2 landing points.
Who owns the Hachijojima-Mainland cable?
Hachijojima-Mainland is owned by a consortium including NTT.
When was Hachijojima-Mainland put into service?
The Hachijojima-Mainland cable entered service in 2008.
Hachijojima-Mainland
  • StatusIn Service
  • Ready for Service2008

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
Submarine cables Land fiber Live probes
Advertisement
Explore GeoCables: interactive submarine cable map, all 728 submarine cables, live internet latency map, cable landing points worldwide

Log In

Access your routes, favorites, and API key

Create account Forgot password?