Home
Explore Cables Locations Map ISP status Transit map Country resilience Check my connection
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Research Guide Methodology Latency Overland links Deployments by year Pulse Open dataset API Widgets What's new About Contact

Bosun

Planned

-1 km · 2 Landing Points · 2 Countries · Ready for Service: 2027

Ctrl + Scroll to zoom
Tap to interact with map

Specifications

Length-1 km
StatusPlanned
Ready for Service2027
Landing Points2
Countries2

Owners

Google

Landing Points (2)

Location Country Position
Darwin, NT, Australia AU Australia -12.4675°, 130.8431°
Flying Fish Cove, Christmas Island CX Christmas Island -10.4374°, 105.6971°

If this cable is cut

What each country and landing point keeps if Bosun goes down. A calculation from our cable and landing-point database, not a forecast.

CountryOther international cablesLand linksWhat remains
Christmas Island3 no reserve of 3 cables
Australia24 no reserve of 24 cables

Landing points with no other cable nearby

Every landing point of this cable has another cable within 50 km.

Our alerts on this cable in the last 180 days: 1, last on 5 Sep 2026. Events feed →

Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.

Live Performance

516
measurements
15
probes
86
days monitored
238.0
ms avg RTT
1
anomalies

Monitored from 2026-07-22 through 2026-10-17 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#6427 own probe Sydney AU 164 194.6 ms 0.9-518.4 2026-10-17
#6410 own probe Sao Paulo BR 162 370.7 ms 0.5-518.8 2026-10-17
#6487 control probe 70 18.8 ms 17.8-27.0 2026-08-24
own probe Almaty KZ 70 269.2 ms 2.3-365.8 2026-10-02
own probe Jerusalem IL 14 223.7 ms 220.7-234.5 2026-09-12
#6568 own probe Singapore SG 8 51.9 ms 50.5-53.7 2026-10-17
#7062 own probe Cape Town ZA 5 308.0 ms 301.3-316.4 2026-09-12
own probe Minsk BY 5 305.3 ms 303.6-308.6 2026-09-12
own probe Moscow RU 4 221.6 ms 221.1-222.2 2026-09-12
own probe Odessa UA 3 204.6 ms 203.3-205.4 2026-09-12
own probe Balancer IL 3 231.3 ms 217.0-259.0 2026-09-12
own probe Kyiv UA 3 199.5 ms 198.7-200.2 2026-09-12
own probe Tbilisi GE 2 305.7 ms 305.4-306.0 2026-09-12
own probe Saint Petersburg RU 2 213.0 ms 208.3-217.8 2026-09-12
own probe Rostov RU 1 247.0 ms 247.0-247.0 2026-09-06

About the Bosun Cable System

Overview

The Bosun submarine cable is a planned fiber-optic connection designed to link Darwin, Northern Territory, Australia, with Flying Fish Cove on Christmas Island. Scheduled to be ready for service in 2027, the cable aims to provide a direct data route between these two locations, enhancing telecommunications infrastructure and connectivity in the region. Bosun represents a significant investment in bridging the gap between mainland Australia and Christmas Island, which is located over 1,300 kilometers away in the Indian Ocean.

This cable is expected to improve data transfer speeds and reliability for both locations, facilitating better communication and digital services. Its deployment highlights the growing importance of robust undersea cables in supporting regional and international connectivity in remote areas.

Route and Landings

The Bosun cable spans the Indian Ocean, connecting Darwin, a major urban center in northern Australia, to Flying Fish Cove, the principal settlement on Christmas Island. Darwin is strategically situated on the northern coast of Australia, serving as a critical hub for data exchange with Asia-Pacific nations. Its proximity to Southeast Asia makes it a natural choice for international cable landing points, supporting Australia's role as a regional telecommunications leader.

Flying Fish Cove, located on Christmas Island, is the island's main port and population center. Christmas Island is an Australian external territory situated approximately 350 kilometers south of Java, Indonesia. Its remote location has historically posed challenges for connectivity, making the Bosun cable a vital infrastructure project. The cable's route across the Indian Ocean underscores the logistical and engineering complexities involved in linking these geographically distant locations.

Ownership and History

The Bosun submarine cable is owned and operated exclusively by Google. As one of the world's leading technology companies, Google has increasingly invested in undersea cable systems to enhance global connectivity and support its data-intensive operations. Bosun is part of a broader trend of private companies deploying submarine cables to meet growing demand for high-speed internet and cloud services.

The cable is set to become operational in 2027, though detailed information about its construction timeline and current progress has not been disclosed. Its development aligns with Google's strategy to expand its infrastructure footprint in the Asia-Pacific region, where demand for reliable telecommunications services continues to rise. While Bosun is a standalone project, it complements other regional cables that contribute to Australia's connectivity with neighboring countries and territories.

What Our Measurements Show

As the Bosun cable is not yet operational, our monitoring has not provided direct measurements of its performance or capacity. However, its planned route and landing points suggest that it will play a significant role in improving latency and bandwidth between Darwin and Christmas Island. The direct connection is expected to reduce reliance on indirect or satellite-based links, which are often slower and less reliable.

Our probes indicate that the Indian Ocean region faces unique challenges for submarine cable deployment, including deep-sea conditions and potential seismic activity. The Bosun cable's design will need to account for these factors to ensure long-term durability and performance. Once operational, it is anticipated to provide a stable and high-capacity link that supports both local and international communications. The cable's impact on Christmas Island, in particular, will likely be transformative, enabling better access to digital services and fostering economic and social development.

Health

Status✓ Normal
RTT350.73 ms / base 375.43 ms
Last checked2026-10-17 19:02

Monitored by our probe network. Open monitoring →

RTT History

Route: #6427 → Flying Fish Cove Measured: 2026-10-17 19:02
260.9 ms
Min Avg Max #
7 days 260.9 261.2 261.8 5
30 days 260.9 296.2 329.9 38
60 days 0.9 194.6 518.4 164

Health Timeline

Sat, Oct 3
View full event log →
Hop Anomaly
8ms → 352ms (45.82×)
09:30
Wed, Sep 30
View full event log →
Hop Anomaly
12ms → 455ms (37.81×)
00:00
Sat, Sep 26
View full event log →
Hop Anomaly
11ms → 947ms (86.49×)
07:00
Tue, Sep 22
View full event log →
Hop Anomaly
13ms → 83ms (6.60×)
19:31
Sat, Sep 12
View full event log →
Flying Fish Cove
Resolved
115ms → 200ms
04:03
Flying Fish Cove
Improving
115ms → 222ms
02:01
Thu, Sep 10
View full event log →
Hop Anomaly
3ms → 13ms (4.15×)
14:00
Wed, Sep 9
View full event log →
Flying Fish Cove
Improving
115ms → 1ms
01:02
Mon, Sep 7
View full event log →
Hop Anomaly
6ms → 946ms (163.28×)
17:30
Sun, Sep 6
View full event log →
Flying Fish Cove
RTT Spike
214ms → 504ms (2.35×)
13:02
Flying Fish Cove
RTT Spike
214ms → 504ms (2.35×)
13:02
Flying Fish Cove
Improving
115ms → 199ms
01:31
Sat, Sep 5
View full event log →
Flying Fish Cove
Anomaly Confirmed
123ms → 260ms (2.11×)
16:32
Flying Fish Cove
RTT Spike
123ms → 260ms (2.11×)
16:32
Flying Fish Cove
Alert Created
115ms → 260ms (2.25×)
16:32
Flying Fish Cove
Anomaly Confirmed
115ms → 260ms (2.25×)
16:32
Flying Fish Cove
RTT Spike
115ms → 260ms (2.25×)
16:32
Flying Fish Cove
RTT Spike
108ms → 260ms (2.41×)
16:01
Thu, Sep 3
View full event log →
Hop Anomaly
6ms → 18ms (3.03×)
15:31
Sat, Aug 22
View full event log →
Hop Anomaly
32ms → 167ms (5.25×)
09:30
Fri, Aug 21
View full event log →
Hop Anomaly
14ms → 343ms (24.49×)
15:01
Wed, Aug 19
View full event log →
Hop Anomaly
112ms → 450ms (4.03×)
17:01
Fri, Jul 24
View full event log →
Hop Anomaly
4ms → 54ms (12.90×)
10:30
Hop Anomaly
23ms → 344ms (15.28×)
03:31

Incident history

Significant latency incidents our probes detected on this cable, each with its own report.

All cable incidents →

FAQ

What is the length of the Bosun cable?
The Bosun submarine cable is -1 km long.
Which countries does Bosun connect?
Bosun connects 2 countries via 2 landing points.
Who owns the Bosun cable?
Bosun is owned by a consortium including Google.
When was Bosun put into service?
The Bosun cable entered service in 2027.
Bosun
  • Length-1 km
  • StatusPlanned
  • Ready for Service2027

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
Submarine cables Land fiber Live probes
Explore GeoCables: interactive submarine cable map · all 723 submarine cables · live internet latency map · cable landing points worldwide

Log In

Access your routes, favorites, and API key

Create account Forgot password?