-1 km · 2 Landing Points · 2 Countries · Ready for Service: 2027
| Length | -1 km |
|---|---|
| Status | Planned |
| Ready for Service | 2027 |
| Landing Points | 2 |
| Countries | 2 |
| Location |
|---|
| Darwin, NT, Australia |
| Flying Fish Cove, Christmas Island |
What each country and landing point keeps if Bosun goes down. A calculation from our cable and landing-point database, not a forecast.
| Country | Other international cables | Land links | What remains |
|---|---|---|---|
| Christmas Island | 3 | no | reserve of 3 cables |
| Australia | 24 | no | reserve of 24 cables |
Every landing point of this cable has another cable within 50 km.
Our alerts on this cable in the last 180 days: 1, last on 5 Sep 2026. Events feed →
Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.
Monitored from 2026-07-22 through 2026-10-17 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data.
| Probe | Location | Samples | Avg |
|---|---|---|---|
| #6427 own probe | Sydney AU | 164 | 194.6 ms |
| #6410 own probe | Sao Paulo BR | 162 | 370.7 ms |
| #6487 | control probe | 70 | 18.8 ms |
| own probe | Almaty KZ | 70 | 269.2 ms |
| own probe | Jerusalem IL | 14 | 223.7 ms |
| #6568 own probe | Singapore SG | 8 | 51.9 ms |
| #7062 own probe | Cape Town ZA | 5 | 308.0 ms |
| own probe | Minsk BY | 5 | 305.3 ms |
| own probe | Moscow RU | 4 | 221.6 ms |
| own probe | Odessa UA | 3 | 204.6 ms |
| own probe | Balancer IL | 3 | 231.3 ms |
| own probe | Kyiv UA | 3 | 199.5 ms |
| own probe | Tbilisi GE | 2 | 305.7 ms |
| own probe | Saint Petersburg RU | 2 | 213.0 ms |
| own probe | Rostov RU | 1 | 247.0 ms |
The Bosun submarine cable is a planned fiber-optic connection designed to link Darwin, Northern Territory, Australia, with Flying Fish Cove on Christmas Island. Scheduled to be ready for service in 2027, the cable aims to provide a direct data route between these two locations, enhancing telecommunications infrastructure and connectivity in the region. Bosun represents a significant investment in bridging the gap between mainland Australia and Christmas Island, which is located over 1,300 kilometers away in the Indian Ocean.
This cable is expected to improve data transfer speeds and reliability for both locations, facilitating better communication and digital services. Its deployment highlights the growing importance of robust undersea cables in supporting regional and international connectivity in remote areas.
The Bosun cable spans the Indian Ocean, connecting Darwin, a major urban center in northern Australia, to Flying Fish Cove, the principal settlement on Christmas Island. Darwin is strategically situated on the northern coast of Australia, serving as a critical hub for data exchange with Asia-Pacific nations. Its proximity to Southeast Asia makes it a natural choice for international cable landing points, supporting Australia's role as a regional telecommunications leader.
Flying Fish Cove, located on Christmas Island, is the island's main port and population center. Christmas Island is an Australian external territory situated approximately 350 kilometers south of Java, Indonesia. Its remote location has historically posed challenges for connectivity, making the Bosun cable a vital infrastructure project. The cable's route across the Indian Ocean underscores the logistical and engineering complexities involved in linking these geographically distant locations.
The Bosun submarine cable is owned and operated exclusively by Google. As one of the world's leading technology companies, Google has increasingly invested in undersea cable systems to enhance global connectivity and support its data-intensive operations. Bosun is part of a broader trend of private companies deploying submarine cables to meet growing demand for high-speed internet and cloud services.
The cable is set to become operational in 2027, though detailed information about its construction timeline and current progress has not been disclosed. Its development aligns with Google's strategy to expand its infrastructure footprint in the Asia-Pacific region, where demand for reliable telecommunications services continues to rise. While Bosun is a standalone project, it complements other regional cables that contribute to Australia's connectivity with neighboring countries and territories.
As the Bosun cable is not yet operational, our monitoring has not provided direct measurements of its performance or capacity. However, its planned route and landing points suggest that it will play a significant role in improving latency and bandwidth between Darwin and Christmas Island. The direct connection is expected to reduce reliance on indirect or satellite-based links, which are often slower and less reliable.
Our probes indicate that the Indian Ocean region faces unique challenges for submarine cable deployment, including deep-sea conditions and potential seismic activity. The Bosun cable's design will need to account for these factors to ensure long-term durability and performance. Once operational, it is anticipated to provide a stable and high-capacity link that supports both local and international communications. The cable's impact on Christmas Island, in particular, will likely be transformative, enabling better access to digital services and fostering economic and social development.
What next: Explore Bosun on the interactive submarine cable map, browse the full catalog of submarine cables, or follow live network events and real-world internet latency.
| Status | ✓ Normal |
|---|---|
| RTT | 350.73 ms / base 375.43 ms |
| Last checked | 2026-10-17 19:02 |
Monitored by our probe network. Open monitoring →
| Min | Avg | Max | # | |
|---|---|---|---|---|
| 7 days | 260.9 | 261.2 | 261.8 | 5 |
| 30 days | 260.9 | 296.2 | 329.9 | 38 |
| 60 days | 0.9 | 194.6 | 518.4 | 164 |
Significant latency incidents our probes detected on this cable, each with its own report.
Find the actual cable routing distance between any two cities
Open Calculator →