Home
Explore What GeoCables can do Cables Locations Map My path ISP status Country resilience Check my connection Blocked websites
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Test yourself Research Guide Methodology Latency Overland links Deployments by year Earthquakes Open dataset API Widgets What's new About Contact

BCS North - Phase 2

In Service

280 km · 3 landing points · 2 countries · Ready for Service: 2000

Follow BCS North - Phase 2
In TelegramCheck my routeAlerts for incidents on this cable and outages in its countries.
Ask about this
The assistant answers from our own measurements and cable database: every answer rests on data, not guesswork.

Reliability passport

44 out of 100
Reliability index
70%
Stability
checks within 1.2x of the route baseline, last 365 days
4
Significant incidents
last 365 days, average 3.6 h to recovery
26
Age
years in service, typical design life 25
141
Countries routing through it
would see a longer path if it broke
1201022026-03: 79%, n=17032026-04: 76%, n=71042026-05: 69%, n=191052026-06: 63%, n=68062026-07: 81%, n=31072026-08: 93%, n=40082026-09: 60%, n=58092026-10: 60%, n=158102026-11: 100%, n=3111

Share of stable checks by month; marks are significant incidents

The index is built on the delay between the two ends of the cable. Damage near the shore of one country may not show in such a measurement; what is happening in the cable's countries right now is shown below.

How the index is computed

100 minus: anomalous checks share x 300 (max 30); significant incidents x 8 (max 40); (95th percentile of latency to baseline - 1.3) x 50 when above 1.3 (max 15); (age - 20 years) x 1.5 when older than 20 (max 15). Latency is measured as a ratio to each route's own baseline, so cables of different length compare fairly. A significant incident is unavailability or a latency peak of 1.5x lasting an hour or more, confirmed by more than one vantage point.

Cities near the landing points of the BCS North - Phase 2 cable: 12

Cities no farther than 50 km from where the cable comes ashore. This is geography, not a measurement of which cable carries a city's traffic.

Landing pointCities nearby
Helsinki, FinlandHelsinki 0 km, Espoo 16 km, Vantaa 15 km, East Helsinki 9 km, Porvoo 47 km
Kotka, FinlandKouvola 42 km, Kotka 5 km, Karhula 3 km, Hamina 19 km, Anjala 20 km
Logi, RussiaSosnovyy Bor 35 km, Kingisepp 48 km

Not counted in the chart and the baseline: 23 checks in the last year where the far end did not answer and the delay was calculated from the other landing of the cable, not measured.

Ctrl + Scroll to zoom
Tap to interact with map

Specifications

Length280 km
StatusIn Service
Ready for Service2000
Landing Points3
Countries2

Owners

Arelion

Internet outages by country

FinlandRussia
Advertisement
Advertisement

Landing Points (3)

Location Country Position
Helsinki, Finland FI Finland 60.1711°, 24.9325°
Kotka, Finland FI Finland 60.5010°, 26.8836°
Logi, Russia RU Russia 59.7999°, 28.4999°

If this cable is cut

What each country and landing point keeps if BCS North - Phase 2 goes down. A calculation from our cable and landing-point database, not a forecast.

CountryOther international cablesLand linksWhat remains
Russia5 yes reserve of 5 cables
Finland14 yes reserve of 14 cables

Landing points with no other cable nearby

Every landing point of this cable has another cable within 50 km.

Alerts on this cable in the last 180 days: 2 (confirmed by witnesses: 2, not checked: 0), last on 8 Oct 2026. Events feed →

Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.

What changes for other countries

What our cable graph says would change for countries whose paths run through this cable. Paths and milliseconds, not capacity.

  • 141 countries would see a longer path
  • Russia to Germany: plus 12.8 ms
  • Kazakhstan to Netherlands: plus 12.8 ms
  • Peru to Russia: plus 12.8 ms
  • Cayman Islands to Russia: plus 12.8 ms
  • Micronesia to Denmark: plus 12.8 ms

See your own path

Live Performance

658
measurements
25
probes
264
days monitored
89.4
ms avg RTT
4
anomalies

Monitored from 2026-03-06 through 2026-11-26 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data.

About the BCS North - Phase 2 Cable System

BCS North - Phase 2: Arelion's Baltic Corridor

BCS North - Phase 2 is a submarine cable system owned by Arelion, connecting Helsinki and Kotka in Finland to Logi in Russia. Spanning 280 kilometers, it is part of the broader BCS North family, which includes Phase 1. The cable is listed as in service, with its ready-for-service (RFS) date recorded in GeoCables' database as 2000. However, public information about its design capacity, fiber pairs, supplier, and technology remains undisclosed. What makes BCS North - Phase 2 particularly interesting is its geographical placement within the Baltic Sea region, a hub for multiple submarine cables. The cable connects Finland and Russia, two countries with significant economic and geopolitical stakes in telecommunications. The corridor's redundancy is strengthened by numerous other cables landing in Helsinki and Kotka, although Logi's alternatives are less documented. Additionally, latency measurements from remote probes reveal the complexities of real-world internet routing, far exceeding the theoretical floor computed for the cable itself.

Quick facts

NameBCS North - Phase 2
Length280 km
Ready-for-Service Date2000 (GeoCables database)
OwnerArelion
StatusIn service
Design CapacityNot disclosed
Fiber PairsNot disclosed
SupplierNot disclosed
TechnologyNot disclosed
Landing PointsHelsinki (Finland), Kotka (Finland), Logi (Russia)

Show BCS North - Phase 2 on the interactive cable map

Route

BCS North - Phase 2 connects three landing points: Helsinki and Kotka in Finland, and Logi in Russia. Helsinki serves as a major hub for submarine cables in the Baltic Sea, hosting connections to Sweden, Estonia, and beyond. Kotka, located on Finland's southern coast, is also connected by the Eastern Light Sweden-Finland I cable. Logi, situated in Russia, is less documented in terms of alternative submarine cable connections. The route spans the Baltic Sea, a region characterized by shallow waters and a relatively stable seabed, which simplifies cable laying and maintenance compared to deeper oceanic environments. The cable's corridor supports data traffic between Finland and Russia, facilitating cross-border connectivity.

Why it was built and what it carries

BCS North - Phase 2 was likely constructed to enhance connectivity between Finland and Russia, supporting both commercial and residential internet traffic. The Baltic Sea region is a critical area for telecommunications, with numerous cables converging to support high-bandwidth demands. While specific details about the cable's design capacity and technology are not publicly available, it is reasonable to assume that it was built to accommodate growing data requirements at the time of its deployment.

History: what can be established

GeoCables records the cable's ready-for-service date as 2000. If alternative industry sources suggest a different year, this discrepancy could arise from delays in documentation, variations in definitions of "ready-for-service," or differences between the cable's physical completion and its operational status. Arelion, the owner, has not publicly disclosed further historical details about the cable's construction or upgrades.

Capacity and technology

Publicly available information does not disclose the design capacity, fiber pair count, supplier, or specific technology used in BCS North - Phase 2. Without operator documentation, attributing these parameters would be speculative. Given its deployment in 2000, it is likely that the cable uses optical fiber technology common at the time, but whether it has been upgraded since remains unknown.

Latency: the physics

The theoretical one-way latency for light propagation over the cable's 280 km wet segment is approximately 1.4 milliseconds, with a round-trip time (RTT) floor of 2.7 milliseconds. However, real-world latency measurements from GeoCables' remote probes show significantly higher values:
  • Helsinki -> Logi: Minimum 9.7 ms, average 83.9 ms
  • Logi -> Helsinki: Minimum 4.4 ms, average 55.5 ms
These discrepancies arise from additional factors such as land-based routing, terminal equipment, and internet path inefficiencies. For example, traffic between Minsk and Logi exhibits a minimum RTT of 21.5 ms, while connections from Tbilisi or Jerusalem show much higher latencies, reflecting the broader network topology.

Redundancy: what happens if it breaks

In the event of a failure, redundancy for BCS North - Phase 2 is supported by other cables landing in Helsinki, including Baltic Sea Submarine Cable, BCS North - Phase 1, and C-Lion1. Kotka has fewer alternatives, with Eastern Light Sweden-Finland I being the only documented cable. Logi's redundancy options are unclear, as no other cables are explicitly listed for this landing point. Repairing submarine cables typically involves deploying specialized vessels to locate, retrieve, and mend the damaged section. The Baltic Sea's relatively shallow waters facilitate such operations, reducing repair times compared to deeper oceanic environments.

Bottom line

  • BCS North - Phase 2 spans 280 km, connecting Helsinki, Kotka, and Logi.
  • Owned by Arelion, the cable is listed as in service, with an RFS date of 2000.
  • Design capacity, fiber pairs, supplier, and technology are not publicly disclosed.
  • Theoretical latency is 2.7 ms RTT, but real-world measurements are significantly higher.
  • Redundancy is strong in Helsinki but less documented for Kotka and Logi.

What next: Explore BCS North - Phase 2 on the interactive submarine cable map, browse the full catalog of submarine cables, or follow live network events and real-world internet latency.

Health

Status✓ Normal
RTT76.43 ms / base 8.65 ms
Last checked2026-11-26 02:32

Monitored by our probe network. Open monitoring →

RTT History

Health Timeline

Sat, Oct 17
View full event log →
Logi
RTT Spike
104ms → 398ms (3.84×)
02:33
Fri, Oct 9
View full event log →
Helsinki
Resolved
12ms → 8ms
14:32
Helsinki
Improving
12ms → 3ms
13:30
Hop Anomaly
25ms → 260ms (10.59×)
06:01
Hop Anomaly
5ms → 68ms (12.65×)
04:30
Helsinki
Improving
12ms → 22ms
03:02
Helsinki
Anomaly Confirmed
13ms → 35ms (2.7×)
03:02
Helsinki
RTT Spike
13ms → 35ms (2.7×)
03:02
Helsinki
Alert Created
12ms → 36ms (3.03×)
03:02
Helsinki
Anomaly Confirmed
12ms → 36ms (3.03×)
03:02
Helsinki
RTT Spike
12ms → 36ms (3.03×)
03:02
Helsinki
RTT Spike
11ms → 35ms (3.26×)
02:31
Helsinki
Resolved
25ms → 50ms
01:02
Helsinki
Improving
25ms → 50ms
00:32
Helsinki
Improving
25ms → 50ms
00:01
Thu, Oct 8
View full event log →
Helsinki
Improving
25ms → 50ms
23:01
Helsinki
RTT Spike
21ms → 43ms (2.03×)
22:00
Helsinki
Anomaly Confirmed
20ms → 43ms (2.15×)
21:32
Helsinki
RTT Spike
20ms → 43ms (2.15×)
21:32
Helsinki
Anomaly Confirmed
18ms → 44ms (2.41×)
21:32
Helsinki
RTT Spike
18ms → 44ms (2.41×)
21:32
Helsinki
Improving
25ms → 36ms
21:03
Helsinki
Anomaly Confirmed
17ms → 43ms (2.5×)
21:02
Helsinki
RTT Spike
17ms → 43ms (2.5×)
21:02
Helsinki
RTT Spike
16ms → 43ms (2.75×)
21:01
Helsinki
Improving
25ms → 50ms
20:32
Helsinki
RTT Spike
14ms → 43ms (3.01×)
20:32
Helsinki
Alert Created
25ms → 51ms (2×)
19:01
Helsinki
Anomaly Confirmed
25ms → 51ms (2×)
19:01
Helsinki
RTT Spike
25ms → 51ms (2×)
19:01

Incident history

Significant latency incidents our probes detected on this cable, each with its own report.

All cable incidents →

FAQ

What is the length of the BCS North - Phase 2 cable?
The BCS North - Phase 2 submarine cable is 280 km long.
Which countries does BCS North - Phase 2 connect?
BCS North - Phase 2 connects 2 countries via 3 landing points.
Who owns the BCS North - Phase 2 cable?
BCS North - Phase 2 is owned by a consortium including Arelion.
When was BCS North - Phase 2 put into service?
The BCS North - Phase 2 cable entered service in 2000.
BCS North - Phase 2
  • Length280 km
  • StatusIn Service
  • Ready for Service2000

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
Submarine cables Land fiber Live probes
Advertisement
Explore GeoCables: interactive submarine cable map, all 722 submarine cables, live internet latency map, cable landing points worldwide

Log In

Access your routes, favorites, and API key

Create account Forgot password?