3 submarine cable landing points in Somalia. View coordinates, connected cables, and detailed location info.
Somalia has three submarine cable landing points located in Berbera, Bosaso, and Mogadishu. These landing stations connect the country to six submarine cables, facilitating its international internet connectivity.
The longest cable serving Somalia is the 2Africa cable, which spans 45,000 kilometers and became ready for service in 2024. It connects Somalia to countries including Angola, Bahrain, and Comoros. The newest cable is the Africa-1, which became operational in 2026, covering 10,000 kilometers and linking Somalia to nations such as Algeria, Djibouti, and Pakistan. Other active cables include the PEACE Cable (25,000 kilometers, operational since 2022), Eastern Africa Submarine System (EASSy, 10,500 kilometers, operational since 2010), Djibouti Africa Regional Express 1 (DARE 1, 4,854 kilometers, operational since 2021), and Gulf2Africa (G2A, 1,500 kilometers, operational since 2017).
The main internet service providers by user base in Somalia are Hormuud Telecom Somalia, Telesom, SOMTEL INTERNATIONAL, Golis Telecom Somalia, and Somtel Somalia. Somalia's internet connectivity is classified as moderate, meaning it relies on several cables, but the loss of a main landing station would significantly impact capacity. No outages have been recorded by GeoCables in the past 90 days.
Every cable that lands in this country, with live latency on its page.
Cables landing here whose break would hurt this country most, by our cable graph.
No single cable break would cut this country off: alternatives exist for every cable.
| Name | Connected Cables |
|---|---|
| Berbera, Somalia › | 4 |
| Bosaso, Somalia › | 2 |
| Mogadishu, Somalia › | 3 |
Internet status by provider and the resilience of the country's cable connectivity.
Somalia has 6 submarine cables and 3 landing points in the GeoCables database. The ones with the most landing points here are 2Africa, Djibouti Africa Regional Express 1 (DARE 1), Gulf2Africa (G2A).
The oldest cable in service is Eastern Africa Submarine System (EASSy) (2010), the newest is Africa-1 (2026).
By our cable graph no single break cuts Somalia off. The largest effect comes from Gulf2Africa (G2A): up to plus 4.5 ms towards United Arab Emirates. We count paths and milliseconds, not capacity.
At the last check (2026-11-18 11:40 UTC) the internet in Somalia was working normally. Providers and history