Home
Explore Cables Locations Map My path ISP status Transit map Country resilience Check my connection
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Research Guide Methodology Latency Overland links Deployments by year Pulse Open dataset API Widgets What's new About Contact
← BackResilience indexMy connectionISP status
AW

Submarine cables in Aruba

2 submarine cable landing points in Aruba. View coordinates, connected cables, and detailed location info.

Aruba has two submarine cable landing points located at Baby Beach and Hudishibana. These landing points connect the country to three submarine cables, two of which are currently in service. The Pacific Caribbean Cable System (PCCS), operational since 2015, is the longest cable landing in Aruba, spanning 6,163 kilometers and linking the island to Colombia, Curaçao, Ecuador, Panama, the United States, and the British Virgin Islands. The Alonso de Ojeda cable, in service since 1999, is a shorter route of 122 kilometers that connects Aruba to Curaçao. A third cable, CELIA, is planned for completion in 2027 and will connect Aruba to several locations, including Antigua and Barbuda, Sint Eustatius and Saba, Curaçao, Martinique, Saint Barthélemy, and the United States.

The primary internet service providers in Aruba are Servicio di Telecomunicacion di Aruba (SETAR) N.V., New Millennium Telecom Services N.V., and Starlink. The country is classified as having vulnerable resilience, meaning it depends on one or two cables for connectivity. No outages have been recorded by GeoCables in the past 90 days.

Submarine cable resilience index: 40/100 - vulnerable →

Submarine cables: Aruba (3)

Every cable that lands in this country, with live latency on its page.

Alonso de Ojeda (122 km, since 1999) CELIA (3 700 km, since 2027) Pacific Caribbean Cable System (PCCS) (6 163 km, since 2015)

Vital cables for Aruba

Cables landing here whose break would hurt this country most, by our cable graph.

No single cable break would cut this country off: alternatives exist for every cable.

Landing Points (2)

Name Latitude Longitude Connected Cables

Connectivity status

Internet status by provider and the resilience of the country's cable connectivity.

Outages and ISP status Resilience index Live map

Submarine cables in Aruba: questions and answers

How many submarine cables land in Aruba?

Aruba has 3 submarine cables and 2 landing points in the GeoCables database. The ones with the most landing points here are Alonso de Ojeda, CELIA, Pacific Caribbean Cable System (PCCS).

What are the oldest and newest cables in Aruba?

The oldest cable in service is Alonso de Ojeda (1999), the newest is Pacific Caribbean Cable System (PCCS) (2015). Planned: CELIA (2027).

What happens if a submarine cable to Aruba breaks?

By our cable graph no single break cuts Aruba off. The largest effect comes from Pacific Caribbean Cable System (PCCS): up to plus 10.1 ms towards Vietnam. We count paths and milliseconds, not capacity.

Is the internet working in Aruba right now?

At the last check (2026-11-04 10:07 UTC) the internet in Aruba was working normally. Providers and history

Log In

Access your routes, favorites, and API key

Create account Forgot password?