Home
Explore Cables Locations Map ISP status Shutdowns
Live Live Map Health Latency Pulse Big screen 🖥
Learn Research Guide Methodology
HomeLocationsMicronesia › Magachgil, Yap, Micronesia

Magachgil, Yap, Micronesia

Landing Point · FM Micronesia

1 Connected Cables 9.4439°N 138.0615°E Micronesia
1
Connected Cables
FM
Country
9.44°
Latitude
138.06°
Longitude
Ctrl + Scroll to zoom
👆 Tap to interact with map

Connected Cables

Cable Length RFS Status
SEA-US 14,500 km 2017 Active

📡 Live Performance

16
measurements
6
probes
10
days monitored
27.3
ms avg RTT
0
anomalies

RTT measurements to this landing point from 2026-07-05 through 2026-07-15 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#6410 own probe Sao Paulo BR 3 1.4 ms 1.3-1.5 2026-07-15
#6427 own probe Sydney AU 3 0.9 ms 0.8-0.9 2026-07-15
#6487 own probe Singapore SG 3 0.6 ms 0.3-0.9 2026-07-15
#7062 own probe Cape Town ZA 3 18.1 ms 17.4-18.9 2026-07-15
#1014589 own probe Almaty KZ 3 95.0 ms 88.1-102.4 2026-07-15
#7455 control probe 1 89.1 ms 89.1-89.1 2026-07-15

About Magachgil, Yap, Micronesia

Magachgil, Yap: A Singular Gateway to Global Connectivity

Magachgil, located on the island of Yap in the Federated States of Micronesia, stands out as a unique submarine cable landing point in this Pacific nation. While Micronesia hosts four landing points in total, Magachgil is home to just one cable: the SEA-US. Despite its singular connection, this cable plays a pivotal role in linking Yap to the broader world, spanning an impressive 14,500 km and connecting six other points across the Pacific, including Guam, Indonesia, Palau, the Philippines, and the United States.

The SEA-US Cable: Yap's Connection to the World

The SEA-US cable, operational since 2017, is a critical piece of infrastructure for Yap. It provides international connectivity that stretches from the United States to Southeast Asia, weaving through the Pacific islands. For Yap, this cable is the sole submarine link, making Magachgil a strategic point for the island's digital communications. The cable's chain includes major hubs like Hermosa Beach in the United States and Davao in the Philippines, ensuring Yap is part of a global network despite its remote location.

Positioning Magachgil Among Micronesia's Landing Points

Within Micronesia, Magachgil's role is distinct. While Pohnpei leads the nation with four cables and Kosrae and Weno each host one, Magachgil ranks in the top 75% of landing points by cable count. This single connection is sufficient to meet Yap's needs, contrasting with Pohnpei's busier infrastructure. The SEA-US cable ensures Yap remains connected to international markets, research opportunities, and communication networks, even as other landing points in Micronesia diversify their cable links.

Latency: A Window into Yap's Digital Performance

GeoCables' latency measurements reveal the efficiency of Magachgil's connectivity. With an average round-trip latency of 27 ms and a best-observed latency of 0 ms, the SEA-US cable delivers reliable performance for Yap's users. These figures highlight the cable's capability to support smooth digital interactions, whether for local businesses, government services, or personal communication.

A Remote Island with a Global Reach

Yap's geographic isolation is counterbalanced by its connection to the SEA-US cable. This single link enables the island to participate in the global digital economy, bridging the gap between its traditional way of life and the modern world. While Magachgil may not host multiple cables like Pohnpei, its role in Micronesia's connectivity landscape is no less significant. For Yap, this cable ensures the island remains a part of the global conversation, proving that even a single connection can make a world of difference.

What next: Magachgil, Yap, Micronesia in the global directory of cable landing points; see surrounding routes on the interactive submarine cable map or follow live network monitoring.

Other Landing Points in Micronesia

Landing Point

  • CountryFM Micronesia
  • Coordinates9.4439°N 138.0615°E
  • Connected Cables1

See Real Cable Routes

View actual submarine cable routing from Magachgil, Yap, Micronesia - with backbone nodes, distance calculations, and latency estimates

Open Calculator →
🌊 Submarine cables 🛤 Land fiber 📡 Live probes
Explore GeoCables: interactive submarine cable map · all 700+ submarine cables · live internet latency map · cable landing points worldwide · internet & ISP outages in Micronesia

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?