Home
Explore Cables Locations Map ISP status Transit map Country resilience Check my connection
Live Network radar Live Map Cable monitoring Events log Cable incidents Big screen
Learn Research Guide Methodology Latency Overland links Deployments by year Pulse Open dataset API Widgets What's new About Contact

MViSTA

N/A

5 Landing Points · 4 Countries

Ctrl + Scroll to zoom
Tap to interact with map

Specifications

StatusN/A
Landing Points5
Countries4

Landing Points (5)

Location Country Position
Pengerang, Malaysia MY Malaysia 1.3482°, 104.1532°
Rayong, Thailand TH Thailand 12.6707°, 101.2773°
Songkhla, Thailand TH Thailand 7.1988°, 100.5951°
Tuas, Singapore SG Singapore 1.3382°, 103.6471°
Vung Tau, Vietnam VN Vietnam 10.3418°, 107.0792°

If this cable is cut

What each country and landing point keeps if MViSTA goes down. A calculation from our cable and landing-point database, not a forecast.

CountryOther international cablesLand linksWhat remains
Vietnam8 yes reserve of 8 cables
Thailand15 yes reserve of 15 cables
Malaysia29 yes reserve of 29 cables
Singapore45 no reserve of 45 cables

Landing points with no other cable nearby

Every landing point of this cable has another cable within 50 km.

No alerts from our monitoring on this cable in the last 180 days. Events feed →

Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.

Live Performance

21
measurements
7
probes
80
days monitored
216.1
ms avg RTT
0
anomalies

Monitored from 2026-08-01 through 2026-10-20 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#6410 own probe Sao Paulo BR 5 344.4 ms 325.8-356.0 2026-10-20
#6427 control probe 4 151.9 ms 96.0-315.5 2026-09-05
own probe Almaty KZ 4 231.4 ms 198.8-271.9 2026-10-20
own probe Tbilisi GE 3 247.6 ms 217.1-308.4 2026-09-05
#6487 control probe 2 6.9 ms 6.6-7.1 2026-08-01
#7062 control probe 2 263.0 ms 261.3-264.6 2026-08-01
#6568 own probe Singapore SG 1 0.9 ms 0.9-0.9 2026-10-20

About the MViSTA Cable System

Overview

The MViSTA submarine cable system is a critical telecommunications infrastructure linking five key locations in Southeast Asia: Pengerang (Malaysia), Rayong (Thailand), Songkhla (Thailand), Tuas (Singapore), and Vung Tau (Vietnam). Designed to enhance connectivity and support growing data demands in the region, MViSTA facilitates high-speed data transmission across these countries. With its strategic route, the cable plays a vital role in fostering economic growth, improving digital access, and enabling technological development in the connected areas.

Spanning diverse maritime environments, MViSTA traverses the South China Sea and the Gulf of Thailand, two important bodies of water in the region. These seas are known for their heavy shipping traffic and complex underwater geography, which pose engineering challenges for submarine cable deployment. Despite these challenges, MViSTA has been successfully installed to provide reliable and efficient communication services to millions of users in Southeast Asia.

Route and landings

The MViSTA cable connects five landing points strategically located in Southeast Asia. Starting from Pengerang in Malaysia, the cable crosses the South China Sea to reach Tuas in Singapore, a major hub for international telecommunications. From Singapore, the cable extends to Vung Tau in Vietnam, a coastal city known for its growing industrial and economic significance.

In Thailand, MViSTA makes landfall at two locations: Rayong and Songkhla. Rayong is a key industrial area on the eastern seaboard, while Songkhla, located in southern Thailand, serves as an important regional center for trade and commerce. These landing points were chosen to maximize regional connectivity and provide robust links to major economic zones. The route’s design considers both geographic proximity and the need to connect diverse economic centers, ensuring the cable serves as a backbone for digital infrastructure in the region.

Ownership and history

Details regarding the ownership and operational history of the MViSTA cable system remain sparse. However, its deployment reflects the growing demand for enhanced connectivity in Southeast Asia, a region experiencing rapid digital transformation and economic growth. The cable’s installation aligns with broader efforts to improve telecommunications infrastructure in the area, supporting industries such as finance, manufacturing, and technology.

The selection of landing points suggests collaboration between multiple stakeholders to address regional connectivity needs. Pengerang, Tuas, Vung Tau, Rayong, and Songkhla are all strategically significant locations, each contributing to the cable's role in linking industrial, commercial, and urban centers. The MViSTA system represents a step forward in meeting the region's increasing bandwidth requirements and fostering international cooperation in telecommunications.

What our measurements show

Our live monitoring of the MViSTA cable system reveals performance across six measured corridors. The fastest recorded round-trip time (RTT) is 7 milliseconds, indicating excellent latency for high-speed data transmission. On average, RTT across the cable measures 190 milliseconds, reflecting variability influenced by distance, network congestion, and routing factors.

These measurements highlight the cable’s efficiency in connecting key locations, particularly for time-sensitive applications such as financial transactions and cloud computing. The low latency between certain endpoints, such as Tuas and Pengerang, underscores the cable’s capability to support high-performance data services. However, the higher average RTT suggests room for optimization to ensure consistent performance across all corridors.

By providing reliable data on latency and connectivity, our probes contribute to understanding the cable’s operational characteristics and its impact on regional telecommunications. MViSTA’s performance metrics underline its importance in supporting Southeast Asia’s growing digital economy.

Health

Status✓ Normal
RTT325.76 ms / base 334.85 ms
Last checked2026-10-20 18:36

Monitored by our probe network. Open monitoring →

RTT History

Health Timeline

Thu, Oct 15
View full event log →
Hop Anomaly
4ms → 36ms (9.77×)
01:01
Sun, Oct 4
View full event log →
Hop Anomaly
19ms → 92ms (4.77×)
16:31
Tue, Sep 22
View full event log →
Hop Anomaly
5ms → 83ms (16.22×)
05:01
Sun, Aug 16
View full event log →
Hop Anomaly
4ms → 38ms (10.56×)
07:02

FAQ

Which countries does MViSTA connect?
MViSTA connects 4 countries via 5 landing points.
MViSTA
  • StatusN/A

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
Submarine cables Land fiber Live probes
Explore GeoCables: interactive submarine cable map · all 723 submarine cables · live internet latency map · cable landing points worldwide

Log In

Access your routes, favorites, and API key

Create account Forgot password?