Landing Point · ID Indonesia
| Cable | Status |
|---|---|
| Palapa Ring East | Active |
| Patara-2 | Active |
RTT measurements to this landing point from 2026-04-19 through 2026-07-09 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.
| Probe | Location | Samples | Avg |
|---|---|---|---|
| #1014589 own probe | Almaty KZ | 3 | 255.9 ms |
| #6410 own probe | Sao Paulo BR | 2 | 353.7 ms |
| #6427 own probe | Sydney AU | 2 | 107.2 ms |
| #6487 own probe | Singapore SG | 2 | 18.4 ms |
| #7062 own probe | Cape Town ZA | 2 | 308.6 ms |
| #1014597 own probe | Tbilisi GE | 1 | 216.0 ms |
| #1014969 own probe | Jerusalem IL | 1 | 221.9 ms |
| #1015313 own probe | Sevastopol UA | 1 | 229.6 ms |

Supiori is a regency located in the Indonesian province of Papua, situated in the far eastern reaches of the Indonesian archipelago. As an island territory in this remote region, Supiori's connection to submarine cable infrastructure reflects Indonesia's broader effort to extend digital connectivity across its vast and geographically dispersed island nation. Two submarine cables land at Supiori, linking it into the national network through entirely domestic cable corridors.
Both cables landing at Supiori connect exclusively to other points within Indonesia, meaning this landing point serves as a node within the country's intra-national submarine cable framework rather than as an international gateway. The cables — Palapa Ring East and Patara-2 — together support regional connectivity across the eastern portions of the archipelago, an area that has historically faced geographic barriers to reliable telecommunications.
Palapa Ring East is a submarine cable system stretching 6,300 kilometres, with a ready-for-service date of 2019. The cable connects multiple landing points across Indonesia, forming part of the national Palapa Ring initiative designed to bring connectivity to underserved regions of the country, including the eastern provinces of Papua.
Patara-2 is a shorter cable system measuring 1,200 kilometres in length, with a ready-for-service date of 2023. Like Palapa Ring East, Patara-2 connects landing points entirely within Indonesia, extending the domestic submarine cable network to serve communities in and around Supiori.
Within Indonesia's submarine cable landscape — which spans 70 cables across 139 landing points — Supiori ranks among the more modestly connected locations, hosting 2 cables compared to major hubs such as Batam (20 cables), Jakarta (9 cables), and Tanjung Pakis (9 cables). Nevertheless, Supiori's position in the top 85 percent of Indonesian landing points by cable count reflects the significance of extending domestic cable infrastructure into Papua. Its role is distinctly regional rather than international, complementing the denser cable concentrations found in Java and Sulawesi.
Supiori functions as a domestic connectivity node within Indonesia's eastern submarine cable network. With two cables terminating here — both operating exclusively within Indonesian waters — the landing point supports intra-national data routing for a regency with a population of approximately 24,500 people as of mid-2024. The combination of the long-haul Palapa Ring East and the shorter Patara-2 system provides Supiori with a degree of path diversity within the national network.
As a two-cable landing point in a remote island regency of Papua, Supiori illustrates how Indonesia has extended its domestic submarine cable grid to reach communities far from the country's main connectivity centres. In the broader Indonesian submarine cable graph, Supiori represents the reach of domestic infrastructure into the archipelago's easternmost territories.
What next: Supiori, Indonesia in the global directory of cable landing points; see surrounding routes on the interactive submarine cable map or follow live network monitoring.
View actual submarine cable routing from Supiori, Indonesia - with backbone nodes, distance calculations, and latency estimates
Open Calculator →