Konstanz-Friedrichshafen: 0.51× baseline latency
What we measured
| Cable | Konstanz-Friedrichshafen |
| Segment | Minsk, BY → Friedrichshafen, DE |
| Detected | 2026-07-30 15:02 UTC |
| Resolved | 2026-07-31 00:02 UTC |
| Duration | 9h 0m |
| Observed latency | 36.3 ms |
| Baseline | 70.9 ms · 0.51× |
| Increase | +109% |
| Severity | warning |
Who is affected
Countries where Konstanz-Friedrichshafen comes ashore, how much of their submarine diversity this cable represents, and what our probes currently measure into them.
| Country | Dependence on this cable | Other submarine cables | Our probes see |
|---|---|---|---|
| Germany resilience index: 100 · resilient |
1 of 11 cables (9% of submarine diversity) | Atlantic Crossing-1 (AC-1), C-Lion1, Elektra-GlobalConnect 1 (GC1) +7 more | median 54 ms today vs 56 ms over 30 days (6 routes) - unchanged |
Dependence is structural (share of the country's submarine cables), not a traffic share: real traffic distribution across cables is not public. Terrestrial links are not measured.
Timeline
- Alert 2026073003: warning — ratio 2.08x
- Alert #162 resolved: RTT 36.33ms (baseline 70.92ms), 4 consecutive OK
Detection method
Latency is sampled continuously from our probe network. An alert opens when round-trip time to a monitored endpoint holds above its rolling baseline, and closes automatically once it returns. Full method is described on the methodology page.