1,730 km · 13 Landing Points · 13 Countries · Ready for Service: 1995
| Length | 1,730 km |
|---|---|
| Status | In Service |
| Ready for Service | 1995 |
| Landing Points | 13 |
| Countries | 13 |
What each country and landing point keeps if Eastern Caribbean Fiber System (ECFS) goes down. A calculation from our cable and landing-point database, not a forecast.
| Country | Other international cables | Land links | What remains |
|---|---|---|---|
| Anguilla | 0 | no | cut off by sea, no land links |
| St. Lucia | 1 | no | narrows to 1 cable(s) |
| Dominica | 1 | no | narrows to 1 cable(s) |
| Barbados | 2 | no | narrows to 2 cable(s) |
| St. Vincent & Grenadines | 2 | no | narrows to 2 cable(s) |
| Grenada | 2 | no | narrows to 2 cable(s) |
| Guadeloupe | 2 | no | narrows to 2 cable(s) |
| Sint Maarten | 2 | yes | narrows to 2 cable(s) |
| St. Kitts & Nevis | 3 | no | reserve of 3 cables |
| Antigua & Barbuda | 3 | no | reserve of 3 cables |
| British Virgin Islands | 3 | no | reserve of 3 cables |
| Trinidad & Tobago | 4 | no | reserve of 4 cables |
| Martinique | 4 | no | reserve of 4 cables |
Leading providers in Anguilla: CWC-ROC-11139, ANU-DIGI, CARIBCABLE.
Every landing point of this cable has another cable within 50 km.
No alerts from our monitoring on this cable in the last 180 days. Events feed →
Counted: other international cables landing in the same country (domestic cables between points of one country are not a way out), other cables at landing points within 50 km, and whether the country has land links. Not counted: cable capacity, operator contracts and satellite. Use as a first look at dependence, not as a statement of what would happen.
Monitored from 2026-06-23 through 2026-10-20 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data. ✓ No anomalies detected in the monitored period.
| Probe | Location | Samples | Avg |
|---|---|---|---|
| #12541 | control probe | 56 | 83.1 ms |
| #6410 own probe | Sao Paulo BR | 10 | 187.0 ms |
| #6427 own probe | Sydney AU | 10 | 307.2 ms |
| #6487 | control probe | 10 | 288.5 ms |
| own probe | Minsk BY | 10 | 230.8 ms |
| own probe | Kyiv UA | 10 | 198.1 ms |
| own probe | Saint Petersburg RU | 8 | 191.4 ms |
| #6393 | control probe | 7 | 77.3 ms |
| #18923 | control probe | 2 | 111.9 ms |
| own probe | Odessa UA | 2 | 213.4 ms |
| System Name | Eastern Caribbean Fiber System (ECFS) |
| Length | 1730 km |
| Ready For Service (RFS) | 1995 (GeoCables database value; conflicting industry sources not surfaced) |
| Owners | AT&T, Claro Dominicana (Codetel), Guyana Telephone and Telegraph (GT&T), Liberty Networks, Orange, Verizon |
| Status | In service |
| Design Capacity | Not disclosed |
| Fiber Pairs | Not disclosed |
| Supplier | Not disclosed |
| Technology | Not disclosed |
Show Eastern Caribbean Fiber System (ECFS) on the interactive cable map
What next: Explore Eastern Caribbean Fiber System (ECFS) on the interactive submarine cable map, browse the full catalog of submarine cables, or follow live network events and real-world internet latency.
| Status | ✓ Normal |
|---|---|
| RTT | 78.26 ms / base 79.22 ms |
| Last checked | 2026-10-20 20:32 |
Monitored by our probe network. Open monitoring →
| Min | Avg | Max | # | |
|---|---|---|---|---|
| 7 days | 76.4 | 77.6 | 79.3 | 4 |
| 30 days | 71.9 | 80.1 | 86.6 | 21 |
| 60 days | 71.9 | 83.1 | 127.8 | 56 |
Find the actual cable routing distance between any two cities
Open Calculator →