Home
Explore Cables Locations Map ISP status Shutdowns
Live Live Map Health Latency Pulse Big screen 🖥
Learn Research Guide Methodology
HomeLocationsMadagascar › Mahajanga, Madagascar

Mahajanga, Madagascar

Landing Point · MG Madagascar

2 Connected Cables 15.7137°S 46.3155°E Madagascar
2
Connected Cables
MG
Country
15.71°
Latitude
46.32°
Longitude
Ctrl + Scroll to zoom
👆 Tap to interact with map

Connected Cables

Cable Length RFS Status
2Africa 45,000 km 2024 Active
Djibouti Africa Regional Express 1 (DARE 1) 4,854 km 2021 Active

📡 Live Performance

35
measurements
9
probes
88
days monitored
207.4
ms avg RTT
0
anomalies

RTT measurements to this landing point from 2026-03-08 through 2026-06-05 - live ICMP round-trip time via our monitoring probes. Recomputed daily. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#1014597 own probe Tbilisi GE 8 172.5 ms 164.2-179.9 2026-06-05
#1014473 own probe Minsk BY 6 176.2 ms 149.1-223.4 2026-05-20
#1014589 own probe Almaty KZ 6 232.6 ms 227.7-241.7 2026-05-20
#1014969 own probe Jerusalem IL 6 184.4 ms 177.1-192.6 2026-06-05
#6410 own probe Sao Paulo BR 2 276.2 ms 270.4-282.1 2026-06-05
#6427 own probe Sydney AU 2 360.3 ms 349.4-371.2 2026-06-05
#7062 own probe Cape Town ZA 2 197.8 ms 195.5-200.1 2026-06-05
#1015313 own probe Sevastopol UA 2 234.7 ms 225.5-243.8 2026-04-18
#1015523 own probe Moscow RU 1 182.6 ms 182.6-182.6 2026-05-20

About Mahajanga, Madagascar

Mahajanga, Madagascar: Submarine Cable Landing Point

Mahajanga is a city situated on the northwest coast of Madagascar and serves as the capital of the Boeny Region. As a submarine cable landing point, it connects Madagascar to a broad set of international destinations across Africa, the Middle East, and beyond. Two submarine cables land at Mahajanga, making it one of Madagascar's most connected landing points and placing it alongside Toliara as the country's leading cable hub by cable count.

The two cables landing at Mahajanga together enable connectivity across both regional African corridors and intercontinental routes reaching as far as the Arabian Peninsula. The 2Africa cable links Mahajanga to countries including Angola, Bahrain, Comoros, Côte d'Ivoire, the Democratic Republic of the Congo, and Djibouti, establishing a wide-ranging intercontinental arc. The Djibouti Africa Regional Express 1 (DARE 1) cable complements this by connecting Mahajanga to Djibouti, Kenya, Mozambique, Somalia, and South Africa, anchoring the city within an East African regional network.

Cables Landing at Mahajanga

2Africa is a submarine cable system spanning 45,000 km with a ready-for-service (RFS) year of 2024. Beyond Mahajanga, this cable reaches Angola, Bahrain, Comoros, Côte d'Ivoire, the Democratic Republic of the Congo, and Djibouti. Its extraordinary length reflects its broad geographic ambition, circling large portions of the African continent and extending into the Middle East, making the Mahajanga landing a point of connection to routes well beyond the immediate East African seaboard.

Djibouti Africa Regional Express 1 (DARE 1) spans 4,854 km and became ready for service in 2021. This cable connects Mahajanga to Djibouti, Kenya, Madagascar (through additional landing points on the island), Mozambique, Somalia, and South Africa. Its comparatively shorter length reflects its focus on knitting together East African coastal nations and reinforcing regional connectivity along the western Indian Ocean rim.

Regional Context

Within Madagascar's four submarine cable landing points, Mahajanga ties with Toliara in hosting the highest number of cables, each receiving two. Fort Dauphin and Toamasina each host a single cable. Mahajanga's position on the northwest coast gives it a distinct geographic orientation compared to these peers, facing toward the East African mainland and the Mozambique Channel.

Network Role

Mahajanga functions as a dual-cable hub within Madagascar's submarine cable infrastructure, rather than a single-cable terminus. Through the combination of 2Africa and DARE 1, the landing point supports both broad intercontinental paths reaching the Middle East and West Africa and tighter regional links running along the East African coast. The two cables complement one another in both geographic reach and vintage, with DARE 1 providing an established regional route since 2021 and 2Africa extending the city's international reach from 2024 onward.

The northwest coast positioning of Mahajanga gives Madagascar a direct entry point into East African cable corridors that runs separately from the connectivity provided by landing points on the island's eastern and southern coasts. In the regional submarine cable graph, Mahajanga's two-cable footprint makes it a meaningful node for ensuring that Madagascar's northwest maintains diverse international routing options.

Other Landing Points in Madagascar

Landing Point

  • CountryMG Madagascar
  • Coordinates15.7137°S 46.3155°E
  • Connected Cables2

See Real Cable Routes

View actual submarine cable routing from Mahajanga, Madagascar - with backbone nodes, distance calculations, and latency estimates

Open Calculator →
🌊 Submarine cables 🛤 Land fiber 📡 Live probes
Explore GeoCables: interactive submarine cable map · all 700+ submarine cables · live internet latency map · cable landing points worldwide · internet & ISP outages in Madagascar

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?