HomeSubmarine Cables › Mjolner East

Mjolner East

Planned

450 km · 4 Landing Points · 3 Countries · Ready for Service: 2027

Ctrl + Scroll to zoom
👆 Tap to interact with map

Specifications

Length450 km
StatusPlanned
Ready for Service2027
Landing Points4
Countries3

Owners

GlobalConnect

Landing Points (4)

Location Country Position
Farosund, Sweden SE Sweden 57.8630°, 19.0553°
Helsinki, Finland FI Finland 60.1711°, 24.9325°
Kihelkonna, Estonia EE Estonia 58.3600°, 22.0381°
Tallinn, Estonia EE Estonia 59.4362°, 24.7524°

📡 Live Performance

81
measurements
6
probes
128
days monitored
43.9
ms avg RTT
0
anomalies

Monitored from 2026-03-06 through 2026-07-13 - live ICMP round-trip time measurements via our monitoring probes. All values below are recomputed daily from raw probe data. ✓ No anomalies detected in the monitored period.

Measurement sources

Probe Location Samples Avg Min-Max Last seen
#258 control probe 29 31.1 ms 19.7-53.7 2026-04-07
#29566 control probe 27 4.5 ms 4.2-5.8 2026-04-03
#6427 own probe Sydney AU 8 262.6 ms 262.3-263.1 2026-07-13
#1014473 own probe Minsk BY 8 38.2 ms 37.1-42.9 2026-07-13
#1015563 own probe Saint Petersburg RU 8 15.5 ms 14.7-18.8 2026-07-13
#378 control probe 1 2.7 ms 2.7-2.7 2026-03-11

About the Mjolner East Cable System

Overview

Mjolner East is a submarine cable system spanning approximately 450 km across the eastern Baltic Sea. Designed to connect Estonia, Finland, and Sweden, the cable enhances regional connectivity between the Gulf of Finland and the broader Baltic region. Owned by GlobalConnect, a Nordic telecommunications infrastructure provider, Mjolner East is scheduled to be ready for service in 2027. This cable system is intended to strengthen data traffic routes across three Baltic rim countries, supporting both local and international communications infrastructure.

The cable's strategic placement reflects the growing demand for reliable and redundant connectivity in northern Europe, where increasing digitalization and cross-border data exchange are driving infrastructure development. Mjolner East aims to complement existing systems in the area while offering additional capacity and diversity to the region’s telecommunications network.

Route and Landings

Mjolner East traverses the eastern Baltic Sea, connecting four landing points across three countries. In Estonia, the cable lands at Kihelkonna, a small village on the western coast of Saaremaa Island, and Tallinn, the nation’s capital and a major hub for technology and commerce. Kihelkonna’s location on Saaremaa provides a strategic link to the island’s local communities, while Tallinn serves as a critical node for international connectivity.

In Finland, the cable terminates in Helsinki, the capital city and a central hub for telecommunications in the country. Helsinki’s location on the southern coast makes it a natural choice for connecting Finland to its Baltic neighbors. The Swedish landing point is Farosund, situated on Gotland, the largest island in the Baltic Sea. Gotland’s geographic position has historically made it a key location for maritime and communication links in the region. Together, these landing points form a crucial corridor for data exchange across the eastern Baltic Sea.

Ownership and History

Mjolner East is owned and operated solely by GlobalConnect, a prominent Nordic telecommunications infrastructure company. GlobalConnect specializes in providing fiber-optic networks and data center services across northern Europe, and the addition of Mjolner East to its portfolio reflects its commitment to expanding regional connectivity. The cable is part of the company’s broader strategy to enhance digital infrastructure in the Baltic and Nordic regions.

While Mjolner East is a new initiative with a planned Ready for Service date of 2027, it builds upon the existing network of submarine cables in the Baltic Sea. This includes systems such as STO-HEL-One and BCS North - Phase 1, which have connected Finland and Sweden since the late 1990s and early 2000s. Mjolner East distinguishes itself by linking Estonia, Finland, and Sweden within a single system, offering a new route that complements the region’s existing connectivity options.

What Our Measurements Show

Although Mjolner East is not yet operational, our monitoring of the region’s submarine cable systems highlights the strategic importance of its route. The eastern Baltic Sea is a critical area for data traffic, serving as a gateway between northern Europe and the global telecommunications network. Estonia’s landing points at Kihelkonna and Tallinn reflect the country’s dual focus on regional and international connectivity, with Tallinn acting as a central hub for data exchange.

Similarly, Helsinki’s role as Finland’s primary telecommunications hub underscores the importance of linking the country to its Baltic neighbors. The landing at Farosund on Gotland adds a unique dimension to the cable’s route, as the island has historically been a significant waypoint for maritime and communication routes in the Baltic Sea. The cable’s mid-range length of 450 km is well-suited to the geographical layout of the region, ensuring efficient data transmission across its landing points.

When operational, Mjolner East is expected to provide enhanced redundancy and reliability for the Baltic Sea’s submarine network, addressing growing demand for diverse routing options and supporting the digital needs of communities in Estonia, Finland, and Sweden.

📡 Health

Status✓ Normal
Last checked2026-07-13 10:00

Monitored by our probe network. Open monitoring →

📊 RTT History

FAQ

What is the length of the Mjolner East cable?
The Mjolner East submarine cable is 450 km long.
Which countries does Mjolner East connect?
Mjolner East connects 3 countries via 4 landing points.
Who owns the Mjolner East cable?
Mjolner East is owned by a consortium including GlobalConnect.
When was Mjolner East put into service?
The Mjolner East cable entered service in 2027.
Mjolner East
  • Length450 km
  • StatusPlanned
  • Ready for Service2027

Calculate Cable Distance

Find the actual cable routing distance between any two cities

Open Calculator →
🌊 Submarine cables 🛤 Land fiber 📡 Live probes
Explore GeoCables: interactive submarine cable map · all 700+ submarine cables · live internet latency map · cable landing points worldwide

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?